1 answers
-
Generally speaking, the ground needs 30 * 20 2 = 300 pieces, and the four walls need to be (30 + 20) * 2 * 12 2 = 600, so a total of about 900 pieces are needed. Thank you!
Related questions
2 answers2024-05-21
Solution: Suppose x bricks like this, 6 x = 36 1006 x = 3600 >>>More
The bathroom is 40 decimeters long and 20 decimeters wide, and the floor tiles are 30 yuan per squar
1 answers2024-05-21
It is 40 decimeters long and 20 decimeters wide, and the floor tiles cost 30 yuan per square meter, which costs 240 yuan in total.
It takes 150 pieces to pave the kitchen floor with floor tiles 3 decimeters long and 2 decimeters wi
3 answers2024-05-21
Solution: If you replace the square brick paving with a side length of 3 decimeters, you need such a square brick x block, (3 3) x = (3 2) 150 >>>More
1 answers2024-05-21
35*24 (2*2)=840 4=210 square bricks.
The living room is 30 square meters, and the square with a side length of 8 decimeters is used for a
4 answers2024-05-21
30÷﹙
= 47 blocks. Since the number of tiles cannot be a decimal, at least 47 of these tiles are required. ) >>>More