Can you make a layer of leather clothing and then paint for bathroom waterproofing?

Updated on Bathroom 2024-05-29
2 answers
  1. Anonymous users2024-01-24

    It is not recommended to do this, the waterproof coating needs to be applied directly on the cement-based surface, so as to ensure the waterproof effect. At the same time, it is recommended to use kitchen and bathroom waterproof slurry for bathroom waterproofing, and the following are detailed construction methods and standard requirements:

    1.Clean the base surface and sprinkle it with water to moisten but there should be no stagnant water.

    2.Prepare the quick-setting repair mortar, add water to the quick-setting repair mortar according to the ratio of 3:1, and the adjusted mortar needs to be used up within 5 minutes. The quick-setting repair mortar is evenly brushed on the yin and yang corners, pipes, sanitary ware, floor drain periphery and other parts that are prone to water seepage.

    3.Pour the waterproof liquid and powder into the bucket, then stir evenly with an electric rod, let stand for 3 minutes and stir again for later use.

    4.Paint waterproof coating, the bathroom floor needs to be done, the wall needs to be painted at least to the meter, it is recommended to do the full height. Brush 2-3 times, the total thickness is in.

    5.After the waterproof coating is dry, it is recommended to make a protective layer of mortar in order to ensure strength.

    After the hour, sprinkle water for maintenance, and the part exposed to direct sunlight needs to be covered.

  2. Anonymous users2024-01-23

    It is to make a waterproof layer first, and then make a waterproof coating to avoid water ingress.

Related questions
4 answers2024-05-29

1.The bathroom should be waterproof first (generally the developer has done waterproofing when handing over the house, in order to prevent building quality problems, it is recommended to do it again to rest assured) and then package the riser! >>>More

9 answers2024-05-29

The waterproofing of the bathroom is to ensure that after moving in, the water will not leak downstairs and will not penetrate into the wall, so as to ensure that the wall does not become moldy and the neighborhood is in harmony. >>>More

6 answers2024-05-29

The reason why you do this waterproof and reverse the water is this, the reason is that the ground is not completely dry, because the moisture inside is reversed after brushing the waterproof, this has no effect on the quality, you can wait for the first waterproof to be completely dry in the second brush, I hope it will help you.

3 answers2024-05-29

First do hydropower, then do waterproofing.

After the water and electricity are done, fill the gap between the floor and the water pipe, and then do the waterproofing. >>>More

1 answers2024-05-29

It should be waterproof first, and the water and water pipeline laying area in the squatting pit area should be waterproofed first, and then the installation of water supply and water supply and squatting pit should be carried out.