How to paint the toilet floor?

Updated on Toilets 2024-05-08
1 answers
  1. Anonymous users2024-01-23

    The construction steps of digging excellent floor paint: first clean the ground (dust, oil stains, looseness), and then brush the primer twice, with an interval of more than 3 hours each time, (more than 4 hours after drying, brush the water-based paint twice, with an interval of more than 3 hours each time, and brush the topcoat twice the next day after drying, with an interval of more than 3 hours each time, and reach the best in 7 days.

    Precautions: 1: Brush the tile needs to be tested in a hidden place, because there is a layer of wax on the surface of some tiles, 2: The humidity can not be greater than 85 degrees during construction, and the humidity greater than 85 degrees needs to be separated by 6 hours or more than a day of construction next time).

Related questions
2 answers2024-05-08

The bathroom floor should be tiled and should not be painted. The walls should also be glued with tiles.

6 answers2024-05-08

The area of latex paint around the ceiling = the bottom surface of the surrounding area (i.e., 400 * the length of the periphery) + the thickness of the ceiling (i.e., 60 * the length of the perimeter) + the depth of the lamp trough (i.e. 120 * the length of the perimeter).

4 answers2024-05-08

It is best to use bright colors for decoration, dark colors will look very depressing, living room and dining room, I think yellow or similar bright colors are OK, not only will it appear slightly larger space, but also will not give people a very depressing feeling.

1 answers2024-05-08

Make a slope from the bathroom to connect with the bedroom, the slope is about 1:10, and the material is roughly the same as the bedroom material. After it is done, it will neither affect the aesthetics nor hinder the use, which is only a partial rework. >>>More

1 answers2024-05-08

Method 1: Redo waterproofing.

Redoing waterproofing means re-laying the floor tiles, removing the original tiles and cleaning the base surface. After the cement mortar is proportioned, the ground is leveled and further waterproofed. The height of the waterproof wall is controlled at about 30cm, and the wall is waterproof to better prevent the toilet from leaking. >>>More