The bathroom has been tiled and leaking, how to do it waterproof? How much does it cost per square m

Updated on Bathroom 2024-05-08
6 answers
  1. Anonymous users2024-01-23

    Waterproofing must be done before tiling, you can only pry the tile and redo the waterproofing.

    Dongfang Yuhong's waterproof paint buys a large bucket, which is three or four hundred yuan, and the bathroom at home is enough.

    The bathroom is waterproof, the ground should be fully done, the shower area should be done in meters, and more than 1 meter in other positions is enough.

  2. Anonymous users2024-01-22

    The simple thing is to use paint to do gap treatment, if not, do grouting and blocking, and then not, it is to smash the tile off and redo the waterproofing. It is up to you to choose the manufacturing method according to the leakage situation. If it is very serious, redoing it is a complete solution, if the leakage is not serious, you can try the above methods to save money and trouble.

    The minimum waterproof is 25 yuan m2, and other expenses are calculated separately.

  3. Anonymous users2024-01-21

    This kind of does not knock on the floor tiles, or does not plan, do not dig. There is only a waterproof process to do directly on the original ground. Shanghai is shocked and Chengdu Ye's family waterproof.

    Of course, if you want to smash the bathroom, you can find any one.

  4. Anonymous users2024-01-20

    Ye's family waterproofing can be done, not throwing or digging. Nano-coating directly on the tile.

  5. Anonymous users2024-01-19

    Where are you? There are big differences in regional prices, and the brands of waterproofing are also different.

  6. Anonymous users2024-01-18

    Knock off the leaks, use a tarpaulin, and put the tiles on. It is estimated that each square meter is about 100.

Related questions
9 answers2024-05-08

Bathroom leakage, we must first find out the cause of the bathroom leakage, and then take the corresponding solution. The common causes and solutions of water leaks in the restroom are as follows. >>>More

6 answers2024-05-08

Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced and are most likely to seep water. If the bathroom has a shower room, the waterproof bucket should be ground to 180cm, and if there is a bathtub, the waterproof wall waterproof height adjacent to the bathtub should be 30cm higher than the bathtub

8 answers2024-05-08

The ground, the waterproof coating in the early stage must not be done. >>>More

13 answers2024-05-08

The first is to renovate the treatment, planing the original tile to the original base layer, repairing the waterproof slurry with waterproof slurry to re-do the waterproof layer, and paving the tile after passing the closed water test. The advantage is that the leakage can be effectively solved, but the disadvantage is that it is expensive and time-consuming. >>>More

5 answers2024-05-08

There are two methods: the first is to renovate the treatment, planing the original tile to the original base, re-do the waterproof layer with waterproof slurry after repair, and pave the tile after passing the closed water test. The advantage is that the leakage can be effectively solved, but the disadvantage is that it is expensive and time-consuming. >>>More