Ceiling first or brick first

Updated on Suspended ceilings 2024-05-22
15 answers
  1. Anonymous users2024-01-24

    It depends on your specific situation and personal preferences. If you need to install lamps or other appliances, it may be more convenient to install the ceiling of the penitential stove first. If you want to finish the floor first, then it may be better to apply the tiles first.

    Also, if you need to do the installation of pipes or wires, then it is best to do it before you install the ceiling. In short, according to your specific needs and plans, decide which step to do first.

  2. Anonymous users2024-01-23

    Ceiling first or brick firstMy feelings. Should. It is to put the bricks first. Wait until the last time to suspend the ceiling. The two of them who did the assorted first on ten fingers are not. There is too much meaning, any one can be done?

  3. Anonymous users2024-01-22

    When let the brick be pasted first, if the ceiling is adjusted first, the brick may be half a piece to the position of the front of the forest dust, maybe a small strip, Naduo is not beautiful? The rear ceiling can be used to transfer the bricks inside.

    The first ceiling and then tiling is also easy to produce maintenance problems after the ceiling, and it is inconvenient to disassemble the shed.

  4. Anonymous users2024-01-21

    Let's put bricks first.

    The first ceiling and then the pure finch tiles are also prone to maintenance problems after the ceiling, and the dismantling is not sold early. I hope my pants can help you to!

  5. Anonymous users2024-01-20

    It is correct to put the tiles first and then the ceiling. When the ceiling is suspended, pay attention to protect it so as not to damage the floor tiles.

  6. Anonymous users2024-01-19

    The decoration of the house must be carried out in accordance with the construction order, so that the renovated house will be more beautiful. For laymen, the decoration order is basically not very clear, take the ceiling and tiling as an example, many people do not know which one comes first. So, let's take you to understand the first brick or the ceiling first and the precautions for the living room ceiling.

    Under normal circumstances, the ceiling is hung first and then tiled, the main reason for this is to protect the finished product, and it can also effectively shorten the decoration period and ensure the construction quality. If you stick the bricks first, then you should also prevent the floor tiles from being bumped, even if the protection measures are done well, it is inevitable that some decoration materials will be bumped during the construction of the ceiling.

    Precautions for living room ceilings.

    1. The decoration of the living room ceiling in color can not be too heavy, generally speaking, it is best to use light and bright colors in this area of the living room, do not choose too heavy colors to decorate. Because the heavy color will make people visually produce a feeling of heavy head and light feet, and the dark color will also be more absorbent, Pei Lao will affect the lighting of the living room, making people feel that the whole living room is darker and depressed.

    2. When installing the ceiling in the living room, it should not be too low, generally the floor height of the house we live in is about 3 meters, so the ceiling should not be too low. If it is too low, it will cause a sense of oppression, and if you stay for a long time, it will give people a feeling of breathlessness. The ceiling can be modeled with low sides and high middle, which will not only appear open visually, but also have great benefits for the residence.

    3. Pay attention to the beams in the living room when hanging the ceiling, generally speaking, there will be beams in the ceiling of the living room, so you need to pay more attention to it when decorating. Because the beams are easy to cause mental tension to the occupants, if there happen to be beams in the living room during the installation of the ceiling, the beams can be covered and decorated to eliminate people's sense of tension and depression.

    Article summary: The above is all about the first brick or first ceiling and the precautions for the living room ceiling, I hope it will be helpful to you. If you want to know more about it, please stay tuned to Qeeka Home.

  7. Anonymous users2024-01-18

    There are no strict requirements for which construction will be carried out first and which will be constructed later, but in order to ensure the quality of construction, shorten the decoration period, and do a good job in the protection of finished products, etc., the ceiling will be installed first and then the wall and floor tiles will be installed.

    If you choose to lay the floor tiles first and then install the ceiling, you need to spend a floor tile protection cost after the floor tiles are laid, mainly to prevent the ceiling from hurting the ground if you want to build a frame in the construction, and the ceiling tools, light steel keels, etc. will accidentally fall on the ground and will also bump into the tiles, so you need to use gypsum board to protect the paved floor tiles, which also increases a lot of finished product protection costs.

  8. Anonymous users2024-01-17

    Of course, it is the first to paste the tile, if it is the first to hang the ceiling, one is to paste the tile when the top will be dirty, and the other is to paste the tile and the top of the junction is not beautiful,

  9. Anonymous users2024-01-16

    When let the brick first, if the ceiling is adjusted first, the brick may be half a piece to the top position, maybe a small strip, Nado is not beautiful? The rear ceiling can be adjusted to the bricks inside.

    The first ceiling and then tiling are also easy to produce maintenance problems after the ceiling, and it is inconvenient to disassemble.

  10. Anonymous users2024-01-15

    The decoration construction follows the basic principle of "whoever is dirty first", and the construction sequence of the ceiling and brick laying will vary depending on the space.

    If it is a living room or bedroom, you need to hang the ceiling first and then lay the floor tiles. Because the ceiling of the living room and bedroom is mostly made of gypsum board, wood and other materials, it is a carpentry job. The garbage and dust generated when the ceiling is larger, if the floor tiles are paved first, even if the finished product protection effect of the floor tiles is not ideal even if the adhesive paper is used, it is more difficult to take care of, so it is necessary to do the ceiling first.

    If it is a kitchen and bathroom, you need to lay floor tiles before hanging the ceiling. Because the ceiling used in the kitchen and bathroom is mostly made of aluminum gusset or PVC and other materials, the construction waste is less and the construction is more tidy, so you can pave the floor tiles first and then suspend the ceiling.

  11. Anonymous users2024-01-14

    It should be tiled first, and then the ceiling. In this way, the composite construction specification is composed.

  12. Anonymous users2024-01-13

    Decorate the house with a ceiling and then pave the floor tiles!

  13. Anonymous users2024-01-12

    Basically, the ceiling is suspended first and then tiled.

    If the bricks are laid first, it is easy to cause the brick surface to bump when making the roof, which will affect the quality of the floor tiles. And if you do the ceiling first, this will not happen. In addition, the ceiling can also shorten the construction period, after all, after the floor tiles are laid, the room will be closed for about 7 days, which is a waste of time.

    Roofing first and then tiling can shorten the construction period.

    In fact, when we install the ceiling, some people will find it more troublesome, so they will not install it, but if you ignore a problem, then you will not feel that the appearance of your home is too high, after all, the exquisite decoration of the ceiling will make the shape of the ceiling more exquisite, and it can also create a home atmosphere, so we will create a space atmosphere or create a space atmosphere for the ceiling, which is also a very important part of highlighting the atmosphere of the home.

    Precautions for installing suspended ceilings

    1. Pay attention to different areas to choose different types of ceilings. Generally speaking, gypsum ceilings are mostly used in places that need to be shaped, such as the location of the living room, and the gypsum board ceiling is generally selected; For bathrooms and kitchens, where there are many things in the ceiling and need to be overhauled, it is recommended to use a gusset ceiling that is easy to remove.

    2. Pay attention to the ceiling not to be too low. The ceiling needs to occupy the floor height of the house, if the original floor height of the house is insufficient, such as less than meters, according to the normal ceiling height, the interior may appear more depressed, in this case, the general choice is to shrink the ceiling height, or use special-shaped ceilings, such as only hanging edges. Or you can take the ceiling of various shapes.

    In short, it should be noted that the ceiling should be slightly higher than too low.

    3. Pay attention to the hidden pipelines and cable quality inside the ceiling. The pipeline cable hidden in the ceiling, after the completion of the ceiling, it is difficult to replace and maintain, even if it is an easily disassembled gusset ceiling, the pipeline installed inside is also difficult to repair or replace, so the pipeline in the ceiling should try to use better quality pipelines and cables.

  14. Anonymous users2024-01-11

    Do the ceiling first or stick the floor tiles first.

    There are no strict requirements for which construction will be carried out first and which will be constructed later, but in order to ensure the quality of construction, shorten the decoration period, and do a good job in the protection of finished products, etc., the ceiling will be installed first and then the wall and floor tiles will be installed. If you choose to lay the floor tiles first and then install the ceiling, you need to spend a floor tile protection cost after the floor tiles are laid, mainly to prevent the ceiling from hurting the ground if you want to build a frame in the construction, and the ceiling tools, light steel keels, etc. will accidentally fall on the ground and will also bump into the tiles, so you need to use gypsum board to protect the paved floor tiles, which also increases a lot of finished product protection costs.

    The conventional order is hydropower tile wood oil, that is, the bricklayer finishes the ceiling to do carpentry, some people feel sorry for the tiles, afraid that the tiles are finished with carpentry destruction, this is their own decoration does not know how to protect, is your home tile paved without protection, directly on the top of the construction? The real decoration construction is determined according to the complexity of your home, and it is very likely that the carpentry and tile paving are crossed, and there is no order at all, which is the coordination of the decoration.

    For example: if you need to put down the door when laying tiles, and you can't use red bricks, you can only use cement pressure plates, at this time the bricklayer can't do it, you can only enter the carpenter to construct first, otherwise you can't put a door carpenter to run a trip, so let the carpenter do it first, and the bricklayer can do it again.

    Theory is just theory, and it depends on the complexity of the construction, and the details are constantly coordinated.

    Precautions. 1. Reserve the lamp trough for good lighting, Zheng Ye This is the most basic function of the ceiling, all kinds of lamps and lanterns are hidden inside the ceiling, forming a reflective light source, creating a warm effect for the living room.

    2. Pay attention to the gusset of the ceiling (if you want to make a ceiling), the material of the ceiling is very important, and the crooked material will be deformed after a long time. There is also a gusset when you ask the all-inclusive price, don't buy the gusset and corners separately.

    3. If it is convenient, the restaurant can also arrange an air fan, so that the ceiling of the hall will not be stained when eating hot pot or making barbecue.

    4. Whether the ceiling is shouted or not, you should pay attention to it when making the ceiling.

  15. Anonymous users2024-01-10

    Kitchen, bathroom and other home spaces in the decoration, are the choice of wall and floor tiles, the top surface of the installation of ceilings, which leads to many people do not know whether to pave the tiles first, or to install the ceiling during construction, so is the ceiling or the first brick? Let's take a look.

    First, the ceiling or the first brick.

    There are no strict requirements for which construction will be carried out first and which will be constructed later, but in order to ensure the quality of construction, shorten the decoration period, and do a good job in the protection of finished products, etc., the ceiling will be installed first and then the wall and floor tiles will be installed.

    Second, what are the advantages of installing the ceiling first and then tiling the wall and floor.

    1. It is convenient for the protection of finished products.

    If you choose to pave the floor tiles first and then install the ceiling, you need to spend a floor tile protection cost after the floor tiles are laid, mainly to prevent the ceiling from hurting the ground if you want to build a frame in the construction, and the ceiling tools, light steel keels, etc. will accidentally fall on the ground and will also bump into the tiles, so you need to use gypsum board to protect the paved floor tiles, which also increases a lot of finished product protection costs, if you choose to pave the ceiling first and then lay the bricks can reduce this cost.

    2. The decoration period can be shortened.

    After laying tiles on the ground, the floor tiles generally need to be maintained, and the construction site will be emptied during this period, and the ground can not be trampled on the quality, otherwise it will affect the effect of paving bricks, and this maintenance period will take about 7 days, that is to say, the ceiling can not be installed at this time, if the ceiling is paved after the floor tiles, the process can be better connected, do not waste time.

    3. Ensure the quality of construction.

    After laying the floor tiles for ceiling construction, it is necessary to install a wooden frame on the floor tiles, and also need to use a herringbone ladder to walk on the ground, which is very harmful to the floor tiles in this process, and will also affect the construction effect of the floor tiles.

    Summary: The above is the introduction of the ceiling or the first brick, I hope the content shared can give you some reference, if you want to know more about the relevant knowledge, you can pay attention to our Qeeka Home information.

Related questions
1 answers2024-05-22

Paste the bricks first, and the cabinets should be on the wall tiles, floor tiles, and the ceiling will be completed before entering the site.

3 answers2024-05-22

The bathroom must be pasted first, the wall tiles are pasted, in order to carry out the later ceiling, if the top falls first, the tiles can not be pasted.

4 answers2024-05-22

Hello, I'm glad to answer for you, in the bathroom, it is tiled first, and then the heating is installed, because the bricks are attached to the wall, and there is no effect on the installation of heating. This is also acceptable to ordinary people.

1 answers2024-05-22

Generally speaking, the cabinets are set first, and then the tiles are paved. >>>More

1 answers2024-05-22

It will be better to seal the balcony first, and then paste the tiles after sealing the balcony, requiring the tiles and the balcony to be flat, which is naturally more difficult than the first brick in the construction. Some people may be misled to paste tiles first, but in fact, the hidden danger is greater and may leak. The specific reasons are as follows: >>>More