The toilet floor is waterproof, dug very deep, why don t you see the steel bar, only cement?

Updated on Toilets 2024-05-25
2 answers
  1. Anonymous users2024-01-24

    If it is a sunken toilet, then the depth of the foundation pit is about 50-60 cm, and there will be no rebar. If it is the ground floor, then there will be no floor slab or floor, and naturally there will be no steel bar. If it is not a sunken bathroom, then the floor slab is about 20 cm, and there will be no steel bars.

    Otherwise, there will be problems.

  2. Anonymous users2024-01-23

    Do you dig hard to do waterproofing, you are the first layer.

Related questions
8 answers2024-05-25

1. The construction of the balcony waterproof layer is relatively simple, and the ground should be leveled before the leakage mold is built, and the water in the insulation layer should be drained. >>>More

15 answers2024-05-25

Hello, Apple Decoration will answer the toilet waterproof construction process for you:

10 answers2024-05-25

Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority. >>>More

1 answers2024-05-25

1. Brush the waterproof paint for the first time. Before construction, it is necessary to ensure that the ground is dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product. >>>More

1 answers2024-05-25

1. Dismantle the old wall and floor tiles.

2. Repaint. >>>More