How high do you need to be to waterproof the bathroom wall brush? Also, should the kitchen be waterp

Updated on Bathroom 2024-05-09
8 answers
  1. Anonymous users2024-01-23

    1.The bathroom should be waterproof, and the walls should be at least more than meters, and it is recommended to do it with full height.

    2.The kitchen also needs to be waterproofed, the kitchen wall needs to be 30 cm high, and the waterproof area of the vegetable sink is 50 cm above the water outlet.

    Bathroom waterproofing practices and steps are as follows:

    1.Do a good job at the grassroots level.

    Normally, the ground is a cement mortar surface, and there are some special circumstances, such as the pipeline is not buried, the ground is uneven, so the base should be smooth, the surface should be smoothed and calendered, solid, there shall be no hollowing, sanding, cracking and other phenomena, and the moisture content of the base should meet the construction requirements of waterproof materials, not greater than 9.

    2.The flooding slope of the screed should be 2

    A slope of 5 (1 20) should be wiped at the root of all pipes against the wall to avoid water accumulation there.

    3.Pipe roots and floor drains that protrude from the floor and walls. Drains, yin and yang angles and other parts that are prone to leakage should be treated with local special plugging.

    4.Stir the paint well, open the paint packaging barrel, and stir well with a stirrer for about 5 10 minutes until the material does not contain agglomerates and does not precipitate. Generally, mechanical mixing is used, and manual mixing is not appropriate.

    5.The first layer of coating film: the waterproof coating is evenly scraped on the surface of the base layer that has been coated with primer with a plastic or rubber scraper, and the thickness is to be uniform and consistent, and the amount of scraping is to.

    It is advisable to operate the wall first and then the ground, retreat from the inside to the outside, and try to be as uniform as possible when coating, without local deposition, without leaving bubbles, and the bonding is tight. When used on a wet or non-absorbent base layer, there is no need to lay the bottom layer.

    6.THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM ABOVE THE GROUND The height of the waterproof layer on the wall of the bathroom near the shower head shall not be less than 1800MM.

    7.When the first layer of coating film is solidified to non-sticky hands, the second coating film waterproof construction is carried out according to the first material construction method. In order to make the thickness of the coating film uniform, the scraping direction must be perpendicular to the direction of the first scraping, and the amount of scraping is slightly less than the first pass, and the thickness is.

    Advisable. 8.THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY PAINTED, AND THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, ESPECIALLY FOR FAƇADE CONSTRUCTION, ONE OR MORE LAYERS CAN BE ADDED. When adding non-woven fabrics, the lower coating and upper coating should be continuously constructed, and the non-woven fabrics should be paved straight, and brushed with a brush without leaving a hollow drum.

    9.The waterproof surface of the coating film is not blistering, does not flow, is smooth and has no concave and convex, and the joints of pipe fittings, sanitary ware feet, floor drains, and drainage outlets are tight, and the end is smooth and non-leaking.

    10.After the waterproofing project is completed, a 24-hour closed water test must be done.

  2. Anonymous users2024-01-22

    1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records.

    2. Check the quality certification documents of the materials and include them in the engineering and technical files.

    3. After the material enters the site, the material inspection report shall be issued according to the specification.

    4. When all the indicators of the physical properties of the material meet the standards, it is qualified; If an index does not meet the requirements of the standard, the index should be re-sampled in the tested product for re-inspection, and the re-test result meets the requirements of the standard, and the batch of materials will be judged to be qualified.

    5. Waterproof material. There are three main categories: waterproofing membranes; 911 polyurethane waterproofing material; New polymer cementitious waterproofing material.

    The last category is divided into general-purpose GS waterproofing materials and flexible JS waterproofing materials. Among them, the universal waterproof material is suitable for the waterproofing of the indoor floor and wall of the family.

  3. Anonymous users2024-01-21

    The bathroom is waterproof, the standard construction requirement is that the ground needs to be done all, and the wall should be at least full high, and if it is a lightweight wall, then it must be done full height.

    At the same time, the kitchen also needs to be waterproof, otherwise it is easy to leak over time, the kitchen needs to do all the waterproof floor, the wall is 30 cm high, and the waterproof area behind the vegetable sink is 50 cm above the water outlet.

  4. Anonymous users2024-01-20

    This is standardized, each part is different, and the bathroom wall also determines the waterproof height according to the situation.

    The waterproof height of the bathroom shower spray wall shall not be less than 2m.

    This article contains detailed waterproof construction and data.

  5. Anonymous users2024-01-19

    It is best to do the top kitchen key is the sink part.

  6. Anonymous users2024-01-18

    More than your basin can be done in the kitchen.

  7. Anonymous users2024-01-17

    The bathroom must be waterproof, and the closed water test must be done. Can exceed the basin of water meters.

  8. Anonymous users2024-01-16

    1200, probably.

Related questions
1 answers2024-05-09

It is to put the water first and then level.

The specific process of home decoration bathroom floor: >>>More

1 answers2024-05-09

Hello, your reply to your question is below.

Speaking of waterproof coatings, in our daily decoration, the bathroom and kitchen use waterproof coatings in the largest area, and it is also a very important project. So what is the difference between rigid and flexible waterproofing materials? >>>More

2 answers2024-05-09

Not necessarily, you need to decide on your next application material according to the nature of your waterproofing coating at that time. >>>More

3 answers2024-05-09

The cement wall of the bathroom of the blank room can be directly brushed with waterproof coating; However, the selection of materials can only be water-based materials, such as JS polymer coatings, at least 2 times. Oily materials such as 911 polyurethane series are not bad, the key is that the surface is relatively smooth after filming, and the later decoration tiles are easy to stick and fall off; Bathroom wall waterproofing is also very critical, many people think that there is no need to do, (the old house basically did not do) I suggest that the bath has to be done on both sides of the bath bomb, decorated, the water in the bath will wash the wall in daily life and cause leakage There are too many cases; There are not a lot of materials and labor, so please refer to my suggestions!

3 answers2024-05-09

It's not that the thicker the better, that's it.

With the deepening of people's understanding of decoration, they are also gradually aware of the importance of waterproof construction. But despite this, it is still not clear how thick the waterproof coating should be, and many people think that the thicker the brush, the better, resulting in the phenomenon of cracks in some rigid waterproof materials. >>>More