What are the steps and preparation materials for waterproofing in the bathroom? Please share it

Updated on Bathroom 2024-05-11
1 answers
  1. Anonymous users2024-01-23

    In fact, waterproof is very simple, the main points, first, waterproof materials, similar to Shenzhen are used here are more Yuhong or Panther series, which is more suitable for home decoration waterproofing, second, do the previous cleaning work, it is best to be like the big brother upstairs said, after leveling, after doing waterproofing, cleaning up the garbage on the ground after leveling, try to be clean, third. Now the mainstream is to use a roller brush, which can ensure efficiency and speed, the corners are brushed with a brush, and the brush is used for the second time after drying, and the height is.

    Fourth, tried, tried to be more than 30 cm high. Three days, no water leakage, OK pass.

    Fifth, do the protective layer. After the protective layer, in order to ensure, in the brush layer, fill the ceramsite!

    Let's talk about the main construction steps?

    The ratio is 1:1 and stir well 3After wetting the roller, start brushing the ground, pay attention to the potholes, be sure to pay attention, be sure to brush, otherwise the water may flow from somewhere.

    4.Generally, it dries in half a day to a day, brush it again, 5Test the water and add water to it, about 30 cm high.

    Soak for 2 days, go downstairs to your house to check whether there is any leakage downstairs, do not call it a day, and make a cement mortar protective layer! If there is a problem, check and find the problem.

    I asked what kind of material you were talking about. 1:1

Related questions
3 answers2024-05-11

First, clean up the base layer, and second, brush waterproof materials (preferably branded). >>>More

3 answers2024-05-11

Bathroom decoration is a more important part of the home decoration, and the bathroom waterproof construction is the key to the bathroom decoration, if the bathroom waterproof construction work is not dealt with, it will bring a lot of problems to our daily life, and it is difficult to construct again, so in the process of home decoration, the bathroom waterproof construction work should be paid attention to, the following Fuwo for you to share the correct bathroom waterproof construction method, I hope to help you. >>>More

4 answers2024-05-11

1 .Preparation before waterproofing, base treatment is carried out according to the condition of the base layer, and the upper boundary agent 2Handle the water prevention nodes such as pipe roots, yin and yang angles, etc. >>>More

5 answers2024-05-11

It is a very important process to do toilet waterproofing, and waterproof construction should be coated with waterproof waterproof The performance of waterproof materials should meet the provisions of the current national standards, and there should be a product qualification certificate; The surface of the base should be smooth, and there should be no defects such as hollowing, sanding, cracking, etc., and the moisture content of the base should meet the construction requirements of waterproof materials; THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, AND THE HEIGHT OF THE WATERPROOF LAYER ON THE WALL OF THE BATHROOM NEAR THE SHOWER HEAD SHALL NOT BE LESS THAN 1800MM; THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY BRUSHED, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, THE WATERPROOF SURFACE OF THE COATING FILM IS NOT BLISTERING, NOT FLOWING, SMOOTH AND CONVEX, AND THE JOINTS OF PIPE FITTINGS, SANITARY WARE FEET, FLOOR DRAINS, AND DRAINAGE OUTLETS ARE TIGHT, AND THE END IS SMOOTH AND DOES NOT LEAK After the waterproof project is completed, it is necessary to do a 24-hour water storage experiment. >>>More

1 answers2024-05-11

Toilet waterproofing practices:

1. Ground treatment. >>>More