The wall tiles of the toilet are cracked, and there are empty tofu slag projects inside, and they ar

Updated on Toilets 2024-05-07
3 answers
  1. Anonymous users2024-01-23

    First of all, remove the old tiles, clean the wall, and chisel the wall with a sharp thing on the wall. Then soak the tiles with water, and cement. Step 1:

    Fill the soaked tiles with a full batch of cement, and be full. Step 2: Stick the bricks with a full batch of cement along the pallet and beat them with a rubber hammer.

    Step 3: After knocking it flat, take it down, see where there is a pulp, and fill it up. Step 4:

    After filling the area that is not full, sprinkle plain cement (pure cement), stick it to the wall again, stick it flat, and beat it firmly with a rubber hammer. Step 5: Because the cement always has to slide, after pasting, it must be filled again with mortar.

    Step 6: In order to paste the wall tiles (neat brick joints) smoothly and regularly, in the process of pasting, insert toothpicks or thin iron nails into the brick joints, and wait until the cement is solidified, and then take it out; Hehe, the bricks will be firm and smooth according to this pasting. If you have more questions, you can click on ID to consult.

  2. Anonymous users2024-01-22

    The reason could be:

    1. There is a lack of light steel hanging net between the inner wall bricks and the pressure plate, and the cement pressure plate is deformed after pasting, and the internal stress leads to the cracking of the inner wall bricks. In the face of this situation, it can not be dealt with simply, and the correct way to deal with it is to smash off the tiles, clean up the base layer, and re-carry out the construction of the light steel hanging net. This will not be the case if the construction is carried out in strict accordance with the regulations.

    2. The floor wall, uneven settlement, or temperature deformation leads to cracking, which is common in the living room floor tiles, this kind of market, after its deformation or settlement is completed, smash the cracked bricks, and make up for it!

    3. In the process of construction, the cement mixing is uneven, and a large amount of cement dry powder is found in the cement slurry, and after the paving is completed, the dry powder begins to hydrate and deform after absorbing sporadic water, resulting in internal stress and cracking. In this case, you can directly smash the new bricks.

    The three conditions have different manifestations, the first is the most common, and the cracking is characterized by large-scale cracking. The second characteristic is longitudinal slit cracking. The third is local bulging, monolithic cracking, or checkers-style cracking!

    It is recommended to find a professional bricklayer to re-tile in accordance with the national standard.

  3. Anonymous users2024-01-21

    The wall is hollow and untreated, and the tiles are pasted, and the plastering layer should be knocked out and re-smoothed, and then tiled. Otherwise, it will still crack if it is pasted.

Related questions
3 answers2024-05-07

It is estimated that the master did not pay attention to the tile damage when installing the tile socket, in fact, the impact is not great, the key is to pay attention to whether the crack has increased.

4 answers2024-05-07

You bought bricks so expensive. Why don't you buy it with me, there may be a problem with the brick, or a problem with the paste. But the possibility of general sticking is most, if it is a problem with bricks, it will be broken if it can't be pasted, and how can it be broken if it is not moved. >>>More

1 answers2024-05-07

There are two possible reasons for this:

1. Tiles that need to be paved with water soaking are not soaked in water or the soaking treatment is not sufficient. In the process of bonding, the tile absorbs the water in the cement mortar too quickly, shortens the natural solidification cycle of the cement mortar, and leads to the delamination of the cement mortar and the tile; >>>More

2 answers2024-05-07

Apply waterproof glue along the gap, it really can't be used, so you can only replace the toilet trough, apply a waterproof layer on the next layer of cement, and then install the toilet trough.

6 answers2024-05-07

I think the kitchen is generally made of a little better material, and I want to paint it. It can be oil-resistant, scrub-resistant, and corrosion-resistant. The color is better white and gray, and it looks neat. >>>More