How to use the toilet without leakage

Updated on Bathroom 2024-05-27
8 answers
  1. Anonymous users2024-01-24

    The entire ground and at least the following walls should be made of waterproof layer, generally SBS, the surface layer can be pasted with floor tiles and wall tiles, and it should be noted that the ground should be sloped to the floor drain, the slope is slightly larger, the drainage is fast, and there is no place for water accumulation.

  2. Anonymous users2024-01-23

    Do waterproofing Do a good job of waterproofing and it won't leak.

  3. Anonymous users2024-01-22

    This needs to be waterproofed at the time of decoration.

  4. Anonymous users2024-01-21

    Your question is vague; or not articulated; It's easier to understand in detail.

  5. Anonymous users2024-01-20

    Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing).

    For the tile surface, first check whether the filling of the tile gap is complete (if the filling of the tile gap is incomplete, fill it with Meiding porcelain glue, and then use a stone tile waterproof guard to do waterproofing).

    Exterior wall paint can be made waterproof with transparent waterproof repair adhesive.

    The product will penetrate into the base layer and make the base layer waterproof. The product is recommended to be constructed in a dry place, the drier the base surface, the deeper the product can penetrate, if the base surface is full of moisture, high density, the material can not penetrate well. Regarding the principle of waterproof plugging, the source of water leakage is not blocked, and the water will only continue to penetrate into the wall, which will exist inside the wall for a long time, and will leak out from other parts of the wall when the water reaches a certain level.

    The problem cannot be solved, and only by spraying waterproofing agent on the outside of the roof or exterior wall so that the water cannot penetrate into the wall and flow away can the problem be completely solved.

  6. Anonymous users2024-01-19

    The first is the blending: powder: water = 1::

    Then feed: according to the shape of the mouth plugging the leak and pinching into a dough slightly smaller than the size of the mouth, put it for a while (it is advisable to pinch it hard by hand) and then stuff it into the leakage port, and use a wooden stick to backlog and smash it to squeeze it all around. It can stop leakage instantly.

    Then apply a layer of scraping material with a trowel about 250px around the outside of the opening, and before plugging the leak, it is best to waterproof the parts around the mouth that may leak. Wait for the coating to have a certain hardness before plugging the leak. Otherwise, water may seep out of the surroundings.

    Wet curing: After the coating is hardened, moisturizing curing should be carried out immediately to prevent chalking, and the first curing should be careful not to damage the coating. In a damp place, or as a protective layer or sticking a tile on the coating, curing can be omitted.

    Post-construction inspection and acceptance methods: after construction, all parts of the entire project should be carefully inspected, which is the weak link, and the cause of the problem is found to be found and repaired in time.

  7. Anonymous users2024-01-18

    Not to use, but when decorating, waterproofing should be done in place. And after doing a good job of water storage test, confirm that there is no water seepage before the next process can be done, and the waterproof layer should not be destroyed during construction.

  8. Anonymous users2024-01-17

    Not to use, but to decorate the lack of grip, waterproofing should be done in place. And after doing a good job of water storage test, confirm that there is no water seepage before you can do the next process, and the waterproof layer should not be destroyed during the construction of Xinyu.

Related questions
1 answers2024-05-27

It is necessary to do a "waterproof layer". Coated with 2 3 layers of waterproof paint, after the paint is dry, then soaked in water for 24 48 hours, if there is no watermark on the top floor of the downstairs room, it means that the waterproof layer is qualified. (The high school physics teacher will answer for you and wish you a happy Chinese New Year).

1 answers2024-05-27

The floor of your bathroom is not waterproofed, or the waterproof layer is not qualified.

2 answers2024-05-27

There is a gap under the threshold stone, hollow it, and it will leak. It needs to be taken care of.

2 answers2024-05-27

If the bathroom floor is too rough, you should first use mortar to find an oblique water to the drain pipe, and then wait until it is dry and then brush the waterproof, and then turn off the water test after it is done

1 answers2024-05-27

It depends on what stage you do waterproofing, if it is done in the foundation before decoration (I mean the original ground) which layer is more critical, (water-based paint and mixed can be, such as JCDecaux, Black Panther, Luban).