The plaster column of the balcony is broken, and only the iron bars in the column are left, can it s

Updated on Balcony 2024-05-18
4 answers
  1. Anonymous users2024-01-24

    Yes, as long as it is not broken, it can be repaired directly.

  2. Anonymous users2024-01-23

    The plaster column of the balcony is broken, and only the iron bars in the column can still be repaired, so it is good to patch the plaster outside.

  3. Anonymous users2024-01-22

    Balcony gypsum columns, if the damaged area is not very large, and the steel bars inside are still intact, then they can be repaired.

  4. Anonymous users2024-01-21

    If you want to fix it, you can fix it.

Related questions
1 answers2024-05-18

Yes, it belongs to the secondary structure, structural columns, >>>More

4 answers2024-05-18

It is a cantilever balcony, and the structural column of its outer corner is a small column such as railing, railing, etc., only to the top of the railing, and should not be connected with the end of the upper layer of the beam, otherwise the elastic bearing is formed under the end of the upper beam, which makes the stress mode of the upper beam change, and the calculation model is not allowed, the bottom of the beam is changed from compression to tension, and the beam becomes semi-simply supported, and the bottom is not configured with stressed steel bars, and it must be cracked!

2 answers2024-05-18

At first glance, it is not in the construction order, and the opening of the downlight hole must be completed before scraping putty. >>>More

1 answers2024-05-18

Can't you remove the structural columns on the side of the balcony, that's the supporting columns of the load-bearing wall!

9 answers2024-05-18

OK. Most of the squatting pits are filled with mortar after positioning, and when this kind of squatting pit is broken, the surrounding stable mortar should be removed to the squatting pit. According to the size of the new squatting pit, clean up the slightly larger area, and install the new squatting pit after the lower sewage pipe is docked without any problem, and the positioning is stable and the floor is restored.