Does the excessive brushing of the waterproof layer in the bathroom affect the tiling? Urgent!

Updated on Bathroom 2024-05-26
3 answers
  1. Anonymous users2024-01-24

    Do not brush the waterproof layer will affect the tiling, the bottom of the wall mortar is generally very absorbent, do not do the treatment of the brick, will be because of the high water absorption rate of the two stickers, the technology in the superb can not be helped. JS is the material mixed with cement.

  2. Anonymous users2024-01-23

    It definitely doesn't matter, if Master says it will affect, it's because he's lazy or can't do it!

    One of the waterproof walls in my house is about 2m high, because the wall is a wardrobe, so I did it deliberately, and when I was pasting tiles, Master looked at it and didn't say anything, just paste!

  3. Anonymous users2024-01-22

    The waterproof layer of the wall is to be brushed while sticking the bricks, and the waterproof layer (wall façade) is directly pasted on the brick after drying, and the bonded mortar is not backwatered, that is to say, the surface of the mortar in contact with the waterproof layer, the water is not absorbed, and the flow is maintained for a long time, and the bricks are pressed to the wall and will fall off immediately, in this case, (there are other situations, such as the concrete wall) the tile will use dry ash to brew it on the ash mouth, so that it can solidify quickly, (even if this is treated, it often happens that "take off the pants" phenomenon) before the upper bricks can be pasted. In this case, one will reduce the strength of the joint surface of the bricks, and the other will affect the progress efficiency of the construction operation.

    The standard construction process requires that the waterproof layer (waterproof mortar prepared by waterproofing agent or plain mortar) should be smeared with a layer of cement mortar before drying, and the tiling construction should be carried out only after drying. However, the conditions in the home decoration construction can only be brushed with waterproof cement slurry and tiled at the same time, which is relatively better to operate.

Related questions
1 answers2024-05-26

If you plan for the long term, it's best to redo it so that it's more waterproof.

10 answers2024-05-26

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-05-26

There is a problem with the selection of waterproof materials, one is a non-standard product, twenty good materials, but it is super soft or oily, which is not conducive to pasting tiles, and it is necessary to take measures, such as brushing, or using tile adhesives.

5 answers2024-05-26

Hello! Under normal circumstances, the cement mortar will begin to solidify after 2 hours, and you can walk on it after 48 hours, but it will take days to completely dry, so you can step on it after 2 days, but it is better to wait a week to move the furniture. >>>More

5 answers2024-05-26

Is it JS or K11 waterproof paint?

Generally, the surface layer is treated after the transformation is completed, such as making a relatively flat protective layer or surface layer (you can use cement covering), and then doing the waterproof layer, prohibiting the person after doing the waterproof layer, and then doing a protective layer, (mainly to protect the destruction of the waterproof layer during the construction process of workers), the flatness requirements are not high, and then you can carry out the specific wall and ground paving construction. >>>More