    Solid wood wall panel installation – keep the wall clean.

    Before installation, the wall should be clean, dry and flat, and the height of the elastic line should be leveled, in order to adapt to the local climate conditions and achieve the moisture content of the air, the purchased wall panel should be unpacked and stored in situ for at least 48 hours before installation.

    Solid wood wall panel installation – pre-sized design.

    Before the panel is installed, the size of the block should be designed first, and each block should be squared and straightened and then tested once, and then formally nailed after adjustment and repair, so as to avoid the pattern of the surface layer is disordered, the color is uneven, the edges and corners are not straight, the surface is uneven, the seams are black and the seams are not strict.

    Solid wood wall panel installation – pull the wire to check the roof panel.

    Before operation, the wire should be pulled to check whether the top of the solid wood wall panel is straight, and if there is any problem, correct it in time. Avoid solid wood wall panels pressed top strip thickness not.

    1. Unfairness, splitting, etc.

    Solid wood wall panel installation - the wall needs to be treated with moisture.

    Due to the high moisture content of wood, it is easy to shrink after drying, resulting in uneven joints or cracking. Therefore, if the wall is damp, it should be dried before construction, or moisture-proof treatment.

    Solid wood wall panel installation - leave gaps on the surface of the panel.

    The height difference of the surface of the solid wood wall panel should be less than; The width of the seam between the plate surfaces should be uniform, and the size deviation should not be greater than 2mm; The diagonal length deviation of a single panel is not more than 2mm; The verticality deviation of the panel is not more than 2mm.

    Solid wood wall panel installation - the yin and yang corners should be horizontal and vertical.

    The yin and yang corners of solid wood wallboard are the key and difficult points of construction, and special attention should be paid to them. The yin and yang angles must be vertical and horizontal, and the seam splicing is 45°.

    Solid wood wall panel installation - the baseboard and the bead should be close to the panel.

    The baseboard and bead should fit snugly against the panel without leaving too many gaps. The spacing of the nails of the fixed baseboard or pressing strip shall generally not be greater than 300mm; The nail cap should be flattened, and the depth into the slats should be, and the nail holes should be smoothed with oily putty of the same color.

  2. Anonymous users2024-01-22

    1. Keep the wall clean: before installation, the wall should be clean, dry and flat, and the height of the elastic line should be leveled, in order to adapt to the local climate conditions and achieve the moisture content of the air, the purchased wall panel should be unpacked and stored in situ for at least 48 hours before installation.

    2. Design the size in advance: Before the panel is installed, the size of the block should be designed first, and each block should be squared and straightened and then tested once, and then formally nailed after adjustment and repair, so as to avoid the pattern confusion of the surface layer, uneven color, unstraight edges and corners, uneven surface, black lines at the seams and loose seams.

    3. Pull the line to check the roof: Before operation, the line should be pulled to check whether the top of the wall panel is straight, and if there is any problem, correct it in time. Avoid the thickness of the wainscoting top strip.

    1. Unfairness, splitting, etc.

    4. Leave gaps on the surface of the panel: the height difference of the panel surface of the solid wood wainscoting panel should be less than; The width of the seam between the plate surfaces should be uniform, and the size deviation should not be greater than 2mm; The diagonal length deviation of a single panel is not more than 2mm; The verticality deviation of the panel is not more than 2mm.

    5. The yin and yang corners should be horizontal and vertical: the yin and yang corners of the wall panel are the key and difficult points of construction, and special attention should be paid to. The yin and yang angles must be vertical and horizontal, and the seam splicing is 45°.

  3. Anonymous users2024-01-21

    1. Before installation, the wall should be kept clean, dry and flat, and the height of the elastic line should be leveled; In order to better adapt to the local climatic conditions, it is best to leave the wainscoting in situ for at least 48 hours after unpacking before installation.

    2. Before installation, each block should be straightened and then tested once, and then formally nailed after adjustment, so as to avoid the pattern confusion of the surface layer, uneven color, unstraight edges and corners, wrong size, uneven surface, black lines at the seams and loose seams.

    3. Before operation, the line should be pulled to check whether the top of the wall panel is straight, and if there is any problem, it should be corrected in time. Avoid the thickness of the wainscoting top strip.

    1. Unfairness, splitting, etc.

    4. Because wood products have a certain moisture content. If the wall is damp, it should be dried before construction, or do moisture-proof treatment: such as making a moisture-proof layer on the wall first, and painting waterproof and moisture-proof coating; Leave ventilation holes on and under the wainscoting.

    5. The height difference of the surface of the wainscoting panel should be less than; The width of the seam between the plate surfaces should be uniform, and the size deviation should not be greater than 2mm; The diagonal length deviation of a single panel is not more than 2mm; The verticality deviation of the panel is not more than 2mm.

    6. The yin and yang corners of the wall panel are the key and difficult points of construction, and special attention should be paid to them. The yin and yang angles must be vertical and horizontal, and the seam splicing is 45°.

    7. The baseboard and pressing strip should be close to the panel, and there should be no excessive gaps. The spacing of the nails of the fixed baseboard or pressing strip shall generally not be greater than 300mm; The nail cap should be flattened, and the depth into the slats should be, and the nail holes should be of the same color.

  4. Anonymous users2024-01-20

    Shandong Dawei overall wood installation service for your service can contact Wei.

Related questions
1 answers2024-05-13

The price of solid wood wainscoting is different, the material of wainscoting is red oak, North American cherry, Burmese teak and Brazilian pear wood, this depends on how you choose, the price ranges from 1080 to 2300 square meters.

3 answers2024-05-13

The price of solid wood wainscoting is different from the stuffiness of the mu, the material of the wainscoting is red oak, North American cherry wood is slow-resistant, Burmese teak and Brazilian pear wood, this depends on how you choose, the price of the hole bends in 1080 2300 a square meter.

4 answers2024-05-13

Eco-boards are sometimes larger than solid wood boards - it is secondary processing and avoids some of the disadvantages of solid wood boards (easy deformation, cracking, etc.). The environmental protection is not as good as solid wood boards, but you can buy high-quality brand products to minimize the harm!

1 answers2024-05-13

Answer: Find a board with the same color and pattern as the solid wood board on the wall, sawn it to the same size as the hole, make the edge smooth, glue it, and plug it. >>>More

3 answers2024-05-13

Simply 1, choose a well-known brand 2, the number and density of the filter element 3, whether the dechlorination function. 4. After-sales service and warranty period. . .