-
If the base is uneven, it will have an impact on the effect of waterproofing, and it is easy to form a hollow part under the convex part.
Do you want to know if you can do mortar leveling first to test the water of the bathroom structure? >>>More
The waterproof material of the bathroom is cement-based, and it is generally no problem to paint it twice after the ground is cleaned. But after this waterproof layer is done, it is necessary to carry out a 24-hour closed water test to confirm that there is no water leakage, and it should be made of cement mortar with a waterproof protective layer with a thickness of about 2 cm, so that the waterproof layer will not be damaged in the future construction. >>>More
It is to put the water first and then level.
The specific process of home decoration bathroom floor: >>>More
After the cement mortar dries, the waterproofing of the brush dries faster and better, and it doesn't matter as long as it doesn't fall off, it just dries a little more slowly.
After the bathroom backfills with cement mortar leveling, the latter page can not be made of waterproof coating, give more than 22 ten years and then do.