Do you want to wet the bathroom after the leak proof paint is brushed the next day?

Updated on Bathroom 2024-05-02
5 answers
  1. Anonymous users2024-01-23

    Do you want to wet the bathroom after the leak-proof paint is brushed the next day?After the leak-proof coating is done, about 24 hours later. After the waterproof coating is painted to form a waterproof layer (about 24 hours later), the water storage is 20 high, and after 24 to 48 hours, see if the water is significantly reduced or go downstairs to see if there are wet water spots on the roof, and if not, it means that the waterproof construction is successful.

    The specific methods of toilet waterproofing are as follows: 1. Use cement mortar on the ground to find a slope in the direction of floor drain, but the surface should be flat. The slope near the entrance is small, and the slope near the floor drain is large.

    2. The pipeline passes through the root of the floor slab and near the floor drain to strengthen the waterproofing. The pipe root building sealing paste is tightly sealed, and the cement is smoothed after the foot guard, and when the waterproof coating is brushed, the glass wire cloth is reinforced with 1 or 2 layers. 3. The wall is clean and flat, without floating ash and small particles, and the small original corner or slope angle is wiped at the junction of the wall and ground.

    When brushing waterproof coating, paste 1 2 layers of glass wire cloth reinforcement. 4. The total thickness of the polyurethane waterproof coating film is required to be more than millimeters. It can't be decided by the number of passes.

    The pipe root and the corner of the reinforcing layer are brushed first, and after the surface is dried at room temperature for 4h, then a large area is brushed and scraped. There shall be no leakage and bubbling. Brush a large area for 24 hours and then apply the next layer after curing.

    5. Paint the façade first and then paint the plane, and the direction of the next painting is perpendicular to the previous one. When the final coating film is semi-cured, the coarse sand particles are thrown to facilitate the combination with the cement mortar in the future. 6. The waterproof layer on the ground should be painted 300mm wide outside the door of the bathroom.

    The waterproof layer of the waterproof ground should be 200mm higher than the ground. 7. Do a 36-hour closed water test as required.

  2. Anonymous users2024-01-22

    Wait until it is dry to store water, and the anti-shabu coating does not use wet Shenzhou Dragon K11 waterproof slurry (general-purpose), which is a two-component polymer modified cement-based waterproof material, suitable for various building bases, and becomes a high-efficiency waterproof layer after drying, and the waterproof layer can be directly carried out for follow-up construction without a protective layer.

    Suggested use: especially suitable for kitchen and bathroom waterproof treatment, breathable and waterproof, environmental protection and non-toxic performance: 1The construction is simple, and the wet area can be directly constructed.

    2.It has a certain toughness, can resist the slight vibration of the substrate, and can cover micro cracks3It has good permeability resistance, can resist high hydrostatic pressure, and can also be used for backwater waterproofing.

  3. Anonymous users2024-01-21

    This mainly depends on your indoor temperature, but you must wait until the waterproof paint of the brush is completely dry before you can release the water, and carry out a closed water test, that is, the floor drain of the bathroom is bonded with tape (there can be no leakage), and the tap water on the bathroom floor is put on the floor for 24 hours to see if there is leakage downstairs, and if there is no leakage problem, the next process can be carried out.

  4. Anonymous users2024-01-20

    After the waterproof coating of the bathroom is dry, the waterproof water is done for 48 hours.

  5. Anonymous users2024-01-19

    Wait until it is completely dry and do a good job of the protective layer before you can do the water storage test!

Related questions
10 answers2024-05-02

The kitchen and bathroom can be entered at any time, and it has nothing to do with marriage, this is something that should be done in daily life, nothing to pay attention to, not too superstitious.

1 answers2024-05-02

Bathroom waterproofing generally requires that the ground is free of water, if the ground has not been dry, there is water to do waterproofing is not good, if it is just wet, no water, does not affect the waterproof construction.

2 answers2024-05-02

It is not recommended to construct in this way, because the waterproof slurry needs to be adjusted and used, and the liquid material is evaporated and dried for too long, so that it is not easy to paint and affect the effect of waterproofing >>>More

2 answers2024-05-02

Maybe it's because the blood is accumulating in the womb and it comes out when it's on the toilet. I'm like this, I rarely come out and only when I urinate.

5 answers2024-05-02

Pressing: Pinch the waist with both hands, do not point back, press on the waist and eyes, squeeze and rotate vigorously to press and knead. >>>More