What is the construction period of bathroom tiles?

Updated on Bathroom 2024-05-20
4 answers
  1. Anonymous users2024-01-24

    It can be done in up to 2 days! It depends on the attitude of the decorator.

    If you pave the floor tiles alone, it is about 15, and it does not contain cement mortar!

    The decoration is like that, if you don't urge, they won't be in a hurry!

    My shop has been renovated many times, and every time I give them a time to die! It had to be done within that time! But it will still procrastinate, in fact, many things can be done in one day, and he will give you three days to do! So you've got to put a little pressure on them!

  2. Anonymous users2024-01-23

    Wrong! To see the waterproof effect, it takes 24 hours to turn off the water and test the leakage. Still have to wait for the waterproof to dry. If you are not in a hurry, it is generally about 3 days!

  3. Anonymous users2024-01-22

    Up to 2 days, the average is about 2 square meters, tiling 18-22 per square meter, and the integrated wall-to-ground sticking method is 33 per square meter. It costs about 200 yuan to do waterproofing.

  4. Anonymous users2024-01-21

    In general, about two days. However, it depends on whether the water pipeline line is changed, and the tiling is between 20 yuan and 30 yuan.

Related questions
4 answers2024-05-20

For such a small area of the bathroom, it is better to use 300 250 wall tiles

7 answers2024-05-20

You can use floor tiles on the wall, or you can use glazed tiles; The hardness of floor tiles is slightly higher than that of glazed tiles, and their cost is slightly higher.

2 answers2024-05-20

First, do a good job of wall waterproofing (ordinary wall not less than 30 cm, shower area not less than 180 cm), then hang net plastering (to ensure that it does not fall off, hollow), and then paste the wall tiles with tile adhesive. >>>More

4 answers2024-05-20

1. Operating conditions.

After the ground is leveled, do a good job of waterproofing the ground and waterproof protective layer. >>>More

1 answers2024-05-20

1. Before tile paving, standardize the acceptance and reasonable protection of the waterproof layer and water circuit transformation to prevent damage to the tile during construction; >>>More