What inspection batch project should be reported for the stainless steel cup holder in the bathroom?

Updated on Bathroom 2024-05-01
2 answers
  1. Anonymous users2024-01-23

    Inspection batch of sanitary equipment sub-project of water supply and drainage division project.

  2. Anonymous users2024-01-22

    The quality inspection and evaluation department is either the safety supervision bureau or the fire department.

Related questions
1 answers2024-05-01

It is recommended to consider the material first, and it is recommended to use 304 stainless steel for the bathroom, and you can consider Xiyouwo stainless steel and 304 stainless steel pipes for refining furnaces.

1 answers2024-05-01

There is a leak in the bathroom floor wiring. Usually it's fine. Once the water leaks, it will increase the ability to conduct electricity. As a result of numb electricity in the faucet, it is recommended to replace the bathroom wires immediately. Or cut it off and discard it. Separate cables. Otherwise, there is danger.

2 answers2024-05-01

There is no doubt that the corrosion resistance of stainless steel is divided into several similar materials. >>>More

1 answers2024-05-01

Stainless steel is good, high-end and generous! The practicality is also high.

11 answers2024-05-01

Focus on the problem of treatment, not how to maintain it. >>>More