Ceiling gypsum board inspection batch quality acceptance record form word format

Updated on Suspended ceilings 2024-04-21
1 answers
  1. Anonymous users2024-01-23

    Look at whether you use the national standard or the provincial standard or the enterprise standard, the more representative enterprise standard is the oil inspection and sales field project, there are independent standards. The inspection batch can be searched in Tanyou, which is generally in the form of a form.

Related questions
1 answers2024-04-21

The inspection and assessment records of the construction unit can be filled in to meet the requirements.

2 answers2024-04-21

It will be useful to save this acceptance diagram later.

2 answers2024-04-21

It is 75 to 90 with the material, and the difference is in the quality of the plasterboard.

1 answers2024-04-21

In the case of double packages, the routine is included, and in the case of light industry, it depends on how you and the ceiling boss talked about it at that time.

2 answers2024-04-21

Boom standard or above. Interval meters. The main keel is spaced in meters. The ratio of the main dragon and the secondary dragon is 1:3, and the main keel is 50-60 wide. The thickness is plus or minus the thickness of the secondary keel is plus or minus mm and the thickness of the gypsum board is above.