Can you still install titanium doors after the bathroom wall tiles are pasted?

Updated on Bathroom 2024-04-05
1 answers
  1. Anonymous users2024-01-23

    1. Operating conditions.

    After the ground is leveled, do a good job of waterproofing the ground and waterproof protective layer.

    Do a good job of installing water and electricity pipelines, and plugging and smoothing scaffolding, eye and pipe holes.

    Basin frames, mirror cards, pipe cards, water tanks, gas, etc. should be buried with anti-corrosion wood bricks and accurate positions.

    Uniform pops up a +500mm horizontal line on the wall.

    The construction process is as follows:

    1) Clean up the base layer, clean up the mortar slag, dust, oil stains, etc. remaining in the base layer, and water and moisten it in advance.

    2) 12mm thick 1:3 cement mortar priming, priming should be layered, each layer thickness should be 5 7mm, and then smooth and rub the hair.

    3) Wait for the bottom layer to be ashed.

    When the sixth and seventh layers are dry, according to the requirements of the drawings, the specifications of the bricks and the actual conditions, the bricks are arranged and the elastic line is carried out.

    4) Use 1:3 cement mortar to stick the corner bricks on the ground as a reference point to control the surface flatness of the floor tiles.

    5) Bottom ruler, calculate the elevation of the lower mouth of the next brick accurately, the upper skin of the bottom ruler is generally 10mm lower than the ground, and put the bottom ruler on this basis, which should be horizontal and stable.

    6) Before the veneer brick, the face brick should be soaked in water for more than 2 hours, and then taken out to dry and set aside.

    7) Wipe the 8mm thick cement mixed mortar bonding layer, scrape flat, paste the surface brick with the wipe from top to bottom, require the mortar to be full, remove and repaste when the ash is lost, and check the flatness with a ruler at any time, and ensure that the width of the gap is consistent.

    8) After pasting after self-inspection without hollowing, unevenness and straightness, wipe it clean with cotton yarn, wipe the joints with white cement slurry or pat dry cement, wipe the plain slurry in the joints with a cloth, and wipe the brick surface clean.

Related questions
4 answers2024-04-05

Absolutely.

In recent years, aluminum doors (color aluminum, titanium aluminum), including special swing doors for bathrooms, have now changed the fairly standard defects left at the door in the past (but the wall tiles must be vertical, and some errors on both sides of the opening will not be affected). Since there is now an aluminium door with a sleeve, both sides and one side are optional. The manufacturer will go to your measuring stick to process, don't worry about the ruler. >>>More

6 answers2024-04-05

OK. Smash it open from the middle of the tile, and then carefully pry it around, usually it will not affect the surrounding tiles. However, before smashing bricks, you need to check whether there are water and electricity pipelines under the bricks, if there are water and electricity pipelines, it is recommended to start from the tiles next to it, and scrap two or three tiles.

5 answers2024-04-05

The ceiling height of the bathroom is already enough to have that meter, and there is no need to add tiles to the top. When installing the ceiling, it can be done close to the upper mouth of the tile, and it can be done without damaging the tiles on the wall. Method: >>>More

6 answers2024-04-05

If you want to deal with this, you need to put a store to prevent friction.

3 answers2024-04-05

First of all, I don't know anything about decorating. I am a material professional, only from the material analysis, if you do not consider the cost, should be titanium alloy, anti-corrosion performance is better than aluminum titanium alloy; On the other hand, aluminum-titanium alloy should be cheaper, lighter, and slightly less anti-corrosion.