How many times to decorate the bathroom waterproofing

Updated on Bathroom 2024-04-29
1 answers
  1. Anonymous users2024-01-23

    Good workers with good technology and conscientious and responsible are enough once. But at present, the general decoration is two times waterproof, one is Lauyal rigid waterproof, and one is other brands of flexible waterproofing.

    For this construction, remember to have after-sales guarantee.

Related questions
1 answers2024-04-29

Choose the material and do it once, but some materials need to be painted twice when used!

1 answers2024-04-29

Generally, waterproof should be done 3 times, in fact, it is not to do it several times, the main thing is to do the work carefully and carefully paint the corners evenly, no bubbles, do a closed water test after drying, after 24 hours of soaking downstairs there is no sign of moisture to qualify, maintain the waterproof layer from damage, as soon as possible to lay the cushion and paste the bricks, you can.

2 answers2024-04-29

Morning: 8:30-9:30 Noon: 11:30-13:

5 answers2024-04-29

Waterproof coating is a kind of film, which is applied to the building with paint and formed by chemical reaction. Through this membrane, the surface of the building is isolated from water, thus playing the role of waterproofing. At present, there are generally two kinds of waterproof coatings on the market, one is polyurethane waterproof coating, and the other is polymer cement-based waterproof coating. >>>More

1 answers2024-04-29

Before decoration, carefully check whether there is leakage in the kitchen and bathroom on the upper floor, and if there is, you should first do the waterproof project upstairs before decorating. If there are no occupants on the upper floor for the time being or for other reasons, the waterproofing works on the upper floor cannot be treated for a while, measures should be taken to remedy the situation: apply polyurethane to the bottom of the leaking part, but the plastering layer of the leaking part should be disposed of and the base layer should be dried.