How to do waterproof bathroom decoration is qualified

Updated on Bathroom 2024-04-03
1 answers
  1. Anonymous users2024-01-23

    1. The waterproof part should be comprehensive;

    Second, the construction of the waterproof layer should be painted in strict accordance with the product instructions and brushed enough to a certain thickness

    3. The construction process should be meticulous: the joints between the wall and the ground, the yin and yang corners, the water pipes, floor drains and sanitary ware, and the seedling ditch where the hot and cold pipes are laid are the key waterproof parts, and the construction must be meticulous.

    The closed water test verifies that the waterproof layer is functioning properly. To do the closed water test, the door and the sewer should be sealed, the depth of the highest point of the aquifer should not be less than 20 mm, and the water storage time should not be less than 24 hours, and whether there was a leakage point.

Related questions
4 answers2024-04-03

Originally, the construction party should have a layer of polypropylene cloth to be waterproof, but now the practice is to coat both sides with a silicone brush. The key part is that the height of the wall of the shower part should be above the meter, and the other walls should be turned up by 30-50 cm, and the floor drain and sewer pipe should be closed with waterproof coating!

2 answers2024-04-03

The waterproofing of the bathroom is done twiceBackfill once before (done after pipe modification). The main purpose is to prevent the pipe from rupturing and generating a large amount of water seepage. The waterproofing after backfilling is carried out after the water and electricity are completed (before tiling). The main purpose is to prevent water from leaking down, and also to prevent moisture from eroding the wall and causing mold. >>>More

14 answers2024-04-03

Waterproofing is an indispensable part of house decoration, waterproof is not done well, the ground is easy to be wet, the wall is easy to mold, and it may also affect other decoration materials, and balconies and windows have hidden dangers of leakage. So in order to avoid these unnecessary troubles, waterproofing must be steady. >>>More

3 answers2024-04-03

Toilet waterproof construction process standard.

First, the process flow. >>>More

11 answers2024-04-03

The wall of the bathroom needs to be waterproofed, which is the standard of architectural decoration, which can not be ignored, and it will also affect your residence if you do not do waterproof for a long time, because there must be a room next door to your bathroom, and there is a simple decoration on the wall. If your hygiene has not been waterproofed for a long time, the water on the bathroom wall will easily corrode and affect your other rooms, so it is necessary to do waterproofing on the bathroom wall.