-
The property fee is waived for one year, at most, and it is impossible to get the developer to pay for it.
-
Please refer to the "Two Books".
The developer is only responsible for repairing the common problems that occur in the house, such as cracks and hollows, in accordance with the construction specifications. If there is a problem with the quality of the house, then it is unlikely that you will change the house, and you can communicate with the developer about the compensation in this regard.
Therefore, you or a friend who understands the aspect of judgment will discuss the situation of the crack in the floor slab you mentioned.
-
I have been buying my house for three years, and now I find that the floor of the living room is broken, from this side of the wall to this side of the wall, now what should I do?
The bathroom generally has a suspended ceiling, and the defects of the construction do not affect the warm and beautiful home, and the ordinary heart is more beautiful.
Of course, it will be counted in the total housing area, whether it is the kitchen, or bathroom, study, utility room, should be included in the area, not because it is poverty alleviation housing or low-rent housing, resettlement housing, etc., only the area of the bedroom and living room. The area of each function room in all buildings should be counted in the gross floor area.
A+B+C=26 6A+6B+6C=1565A+6B+4C=132
2A+B+3C=50 >>>More
This problem, notify the property or developer to carry out repairs. >>>More
1.It has not yet been delivered, and the property rights of the house still belong to the developer, of course, you can't find its theory >>>More