How much is the kitchen leaking without dismantling the bricks and high pressure filling

Updated on Kitchen 2024-04-24
1 answers
  1. Anonymous users2024-01-23

    The decoration company's statement is not right, it should be the kitchen floor waterproofing to do a good job. The general situation is to carry out a 24-hour water storage test after waterproofing, and the floor tiles can be laid only after passing the test.

Related questions
2 answers2024-04-24

This depends on the size of your balcony to know how much it costs. If you are in Haikou, you can contact me.

2 answers2024-04-24

Buy a repair man universal repair belt online to solve the water leakage, more than a dozen yuan.

7 answers2024-04-24

If it is a water pipe exposed to the outside, you can change a section of pipe, and it will be dozens or more than a hundred, if you want to check the water pipe buried under the tile, you want to move the bricks, etc., it is relatively troublesome, the cost depends on the number of moving bricks, and you have to restore the decoration, then at least hundreds of thousands.

3 answers2024-04-24

It's not measured in meters, it's measured in days, or how much money is spent building a stove.

1 answers2024-04-24

Water leakage, but also fundamentally can be completely controlled, water leakage is generally divided into two kinds: >>>More