The bathroom waterproofing made by the developer has been used for eight years and has begun to seep

Updated on Bathroom 2024-04-16
5 answers
  1. Anonymous users2024-01-23

    The bathroom waterproof has been used for eight years, and it has begun to seep water, and the warranty period has expired, and the developer will not be responsible, so he can only bear it and repair it by himself. FYI.

  2. Anonymous users2024-01-22

    The warranty period for residential building waterproofing projects (including roof waterproofing, kitchen and bathroom waterproofing) is five years, and the homeowner needs to bear the responsibility for problems after five years. If most of the owners have a similar situation, they can jointly find the developer to solve it.

  3. Anonymous users2024-01-21

    When the developer delivers the house, it has already advanced the house instruction manual and quality assurance certificate, which stipulates how many years the bathroom is waterproof, and if it is within the warranty period, the developer is responsible for it, and it is borne by itself.

  4. Anonymous users2024-01-20

    If you use it for eight years, it is the cause of waterproof aging, and you should bear it yourself.

  5. Anonymous users2024-01-19

    Refer to the "Instruction Manual and Quality Assurance Certificate for Commercial Housing", which has a clear warranty period.

    The general waterproof water quality warranty is 5 years, and the owner shall bear the responsibility for maintenance after expiration.

    In addition, depending on whether you have decorated, if you have not decorated, you must do it when you decorate, if you have finished decorating, you have used the floor for many years and found that it is leaking now, you can buy some waterproof materials on a treasure (you can brush it directly on the floor without damaging the floor), brush it on the floor yourself, and basically solve the problem of water leakage.

Related questions
3 answers2024-04-16

Before the wall tiles are pasted, quickly treat the waterproofing facilities before laying the underfloor heating and water pipes.

1 answers2024-04-16

It's okay, just ask the decoration company to do it again when the time comes, and you generally have to do it again.

5 answers2024-04-16

The developer has done its part, as for your concerns in the future, it is not easy to say, it is generally 8 to 10 years.

3 answers2024-04-16

The developer simply made the following, and the renovation must be redone at your expense to do the bricking master.

4 answers2024-04-16

In order to prevent the water flow of the toilet into the room, the toilet is lower than the indoor position; The bathroom will destroy the waterproofing made by the developer when the house is renovated in the later stage, and the quality of the materials used in the waterproofing made by the developer will not be very good. >>>More