Is the construction above the color steel ceiling in the workshop considered high altitude work? Tha

Updated on Suspended ceilings 2024-04-27
3 answers
  1. Anonymous users2024-01-23

    Is the construction above the color steel ceiling in the workshop considered high-altitude work? That is, between the color steel ceiling and the roof of the workshop.

    The need to climb is a high-altitude work, and a high-altitude work certificate is required. If there is no such climbing permit, then there is no way to construct, so you must first apply for this certificate point. How to apply for a high altitude permit:

    1) The climbing certificate is managed and issued by the Safety Supervision Bureau, reviewed every three years, and needs to be renewed every six years. In addition, you must be at least 18 years old. (2) Since the climbing certificate is a special operation certificate, it is necessary to conduct relevant physical examinations before processing, and the physical examination form must be used in the training institution to obtain the physical examination form uniformly printed by the Work Safety Supervision Bureau or the physical examination form of the community or hospital at or above the county level, and other operations are similar to the ID card. (3) Prepare the required materials and celebration items, provided that the physical examination is really normal.

    4) If you don't understand anything else, you can also consult the relevant units.

  2. Anonymous users2024-01-22

    Of course, it is considered high-altitude work, as long as the height exceeds 2 meters, it is considered high-altitude work.

    The so-called work at height refers to the work carried out by people at a high place based on a certain position. The national standard GB T 3608-2008 "Classification of Work at Height" stipulates: "All operations carried out at high places where there is a possibility of falling above 2m (including 2m) on the datum of the fall height are called work at height."

    According to this regulation, the scope of work at height in the construction industry is quite extensive. When working in a building, if the operation is carried out on a shelf of more than 2 meters, it is considered to be working at height.

  3. Anonymous users2024-01-21

    Please, is the final answer to this question resolved? I also need to know the answer.

    The ceiling of the workshop is to install the color steel plate ceiling, and now it needs to be constructed on it. It's not considered a high-altitude job.

Related questions
1 answers2024-04-27

Calculated by meter, how much is a meter, this still depends on the project bidding, the construction unit and the construction unit signed by the winning bidder. General power industry and metallurgical industry and other specialized construction teams, their nature is different, the process standards for laying cables are different, and the price of laying one meter of the same 90 square cable will be different.

1 answers2024-04-27

Hello, color steel is a kind of material, and the ceiling is currently made of aluminum alloy. If you have any questions, please feel free to ask.

2 answers2024-04-27

After the installation of each ceiling color plate, it is necessary to fix the color plate and the keel with screws before the installation of the next color plate, and the plate and the plate should be filled as much as possible to ensure the clean room environment in the later stage. The indirect seams of the four color plates should be kept in the crosshairs, so as to facilitate the aesthetics after gluing in the later stage. For the roof joint where the wall panel is located, it can be used as an adjustment joint for the board joint, and the uniformity of the roof joint in other areas of the room can be ensured by adjusting the roof joint in this area. >>>More

1 answers2024-04-27

There is no ceiling in the workshop, and if the air duct and tonnage conflict, one should be chosen.

1 answers2024-04-27

The main keel is fixed by hanging the hanging bar above and below the steel beam, and then the keel frame is fixed by the main bone. It is recommended to hang 600*600 calcium silicate board or sound-absorbing board - light weight, keel needs a large spacing.