How to do waterproofing of open air balconies

Updated on Balcony 2024-04-05
5 answers
  1. Anonymous users2024-01-23

    To do waterproofing, you need to do it on the front of the water.

    Dig the best permeable waterproofing can be do-it-yourself.

    If the cement surface is waterproofed, use a super permeable waterproof guard to do waterproofing (if there are cracks, gaps and potholes on the cement surface, fill the complete with Meiding porcelain glue and then do waterproofing).

    For the tile surface, first check whether the filling of the tile gap is complete (if the filling of the tile gap is incomplete, fill it with Meiding porcelain glue, and then use a stone tile waterproof guard to do waterproofing).

  2. Anonymous users2024-01-22

    1. Find the original waterproof layer. Since the waterproof layer is not exposed, but is in the lower part of the surface layer, it is necessary to eradicate the surface layer and find the original waterproof layer. After the original waterproof layer is eradicated, the water stored in the original lower insulation layer is drained, and some exhaust holes are set up to do the exhaust method to drain the water in the insulation layer.

    Then it is necessary to do slope treatment, do not form part of the roof water storage, usually set up cement mortar leveling slope, slope is not less than 3. Mul.

    2. If in the case of rehabilitation and beautification, the waterproof layer that needs to be done must be a root-blocking waterproof layer, and the root-blocking waterproof layer has a modified asphalt membrane root-blocking waterproof layer, as well as a polymer membrane root-blocking waterproof layer. After the waterproofing is done, it is necessary to carry out a closed water experiment, and the water leakage is qualified, and then the maintenance and paving veneer brick decoration are carried out. In the end, in the case of landscaping and civil engineering cross operations, try not to damage the waterproof layer of the lower part, once damaged, the open-air balcony should be repaired in time.

  3. Anonymous users2024-01-21

    When making an open-air balcony, you should first brush a layer of polyurethane, then a layer of linoleum, then brush once with polyurethane, then lay another layer of linoleum, and finally brush again with a slightly thicker polyurethane. Linoleum must pay attention to lapping, the interface is facing the running side, and the non-flowing side of the linoleum should be turned up 15-20 cm.

  4. Anonymous users2024-01-20

    The floor-to-ceiling doors and windows of the open-air balcony should be equipped with an anti-concrete water retaining platform, and it should be 100mm higher than the surface layer of the balcony

  5. Anonymous users2024-01-19

    Chisel the surface layer, first level the polyurethane 2 thick, turn up 15 25cm around to make the mortar protective layer, and paste the bricks.

Related questions
21 answers2024-04-05

The waterproofing layer of the open-air balcony you are talking about is generally made during the construction stage. The practice of three oils and two felts you said is the old way, and the current practice is to make a thick waterproof layer - modified linoleum waterproof layer. If you want to go to people often, you also need to make a hardened layer on top of the waterproof layer.

5 answers2024-04-05

The material is not right, the construction process is not good! So, repair every year, leak every year! Provide free professional technical consultation for concrete waterproof leakage repair!

2 answers2024-04-05

Developers generally use steel waterproofing to do waterproofing, and there is no problem in using it in the short term, including the closed water test, but after a period of time, the building settles, and the floor deformation caused by vibration will destroy the waterproof layer and produce cracks. >>>More

7 answers2024-04-05

The bathroom is waterproof, and the surrounding walls need to be painted at a height of not less than 30 cm; If there is a shower, the height of the waterproof paint applied on the installation of the shower faucet and the adjacent wall should not be less than 150 cm, preferably about 180 cm. >>>More

8 answers2024-04-05

For kitchen waterproofing, generally we will directly recommend the use of mortar waterproofing agent, which is not only firm with the base surface, but also has high puncture resistance and high puncture strength, which can have the same life as the building, simple and cost-effective construction, and is now the preferred material for home decoration waterproofing. >>>More