Toilet plumbing installation

Updated on Toilets 2024-04-06
1 answers
  1. Anonymous users2024-01-23

    It is necessary to install water, flush tanks, drains, drains, and even hot water, shower ......

Related questions
1 answers2024-04-06

The pipe installed on the outside of the wall is fixed on the wall with a suitable clip, and the pipe is extended to the bottom of the water equipment to be fixed, and the pipeline is required to be horizontal and vertical, and the pipe is optional, metal, aluminum shrinkage, PPR pipe, and the water is not leaking after the angle valve is closed.

1 answers2024-04-06

The installation of the toilet sewer pipe must be accurate, and the socket should be glued, and all plugs must be plugged to the end. After the installation, the hole through the floor slab should be carefully filled with cement mortar to prevent water seepage in the future. After the water pipe is ready, the reserved water nozzle should be wrapped to prevent the cement from falling.

2 answers2024-04-06

If it is a partition shower room, you need to move the hot and cold water or move the shower seat. >>>More

3 answers2024-04-06

It depends on whether it is surfaced or concealed, and the surface installation is the installation of water pipes after tiling. >>>More

1 answers2024-04-06

How does this water pipe installation enlarge the small cup? There must be a septic tank to defecate and defecate.