The cement on the wall of the bathroom of my new house is low, and I rub it back and forth on the wa

Updated on Bathroom 2024-04-12
1 answers
  1. Anonymous users2024-01-23

    Since there are so many worries, it is recommended that you chisel and repaint the stucco layer first, and do not wait for the problem to rework, which will cause even greater losses.

Related questions
2 answers2024-04-12

Toilet dampness is unavoidable and requires water. Splitting the shower and washing machine will not be a problem

3 answers2024-04-12

First, the expansion gap between the floor tiles and the floor tiles and the surrounding walls is too narrow, and when the room temperature changes drastically, the floor, cement layer and ceramic tiles will appear thermal expansion and cold contraction. If the gap is too thin and there is not enough space for the tile to "stretch", the tile is easy to arch, which is generally easy to appear in the northern region, while the south is not easy to appear due to the high humidity and small temperature difference. >>>More

2 answers2024-04-12

You don't have a picture, it's hard to judge, that should be the worker accidentally got it, if it's like a mark symbol or something, the worker got the mark when he was working, and it doesn't affect the use.

5 answers2024-04-12

The solution to the flushing of the door and the toilet!! >>>More

1 answers2024-04-12

I think it's okay! Pay great attention to the supplies in the bathroom, and pay attention to whether there is a non-slip design when buying.