After the water and electricity renovation is completed, how to make the floor drain waterproof in t

Updated on Bathroom 2024-04-27
9 answers
  1. Anonymous users2024-01-23

    Waterproof is best to find a professional waterproof company to do, unless you yourself are a professional, otherwise once there is a leakage will be very troublesome, the waterproof layer must extend from the ground to the wall, 250MM higher than the ground The height of the waterproof layer of the bathroom by the shower head wall shall not be less than 1800MM, the floor drain is directly done on the original base, and then do waterproofing, but the ground will be raised higher, the floor drain should be particularly carefully waterproofed, sealed with plugging treasure or polyurethane sealing paste, and then the overall paint waterproof layer, Be sure to paint carefully around the floor drain, and finally treat the surface as a whole.

  2. Anonymous users2024-01-22

    The master told you is right, do a few more sides of waterproofing is good for the future, I also recommend that you find a professional to do, the material can be bought a little better, waterproofing is a meticulous job, one to do a good job, two to use flexible materials, three to do out the thickness of at least one millimeter, four to no omission No blind spots.

  3. Anonymous users2024-01-21

    It is recommended to find a professional person to do it, unless you are also very professional, and the waterproof materials on the market can be said to be mixed, so you should choose well. The master of the construction of the Haoyang waterproof material used in the last decoration of my house said that the effect is good, and the price is not high.

  4. Anonymous users2024-01-20

    Floor drain waterproofing is the top priority, you should be more careful if you do it yourself, after all, you are not a professional, you first seal the pipe root with JS paint without leakage, and then paint a layer of nano silicon reinforcement, and finally make an overall waterproof layer with other places. It is recommended to use polyethylene polypropylene plus waterproof glue, combined with cement, which is now the best material for Zhengzhou bathroom waterproofing, one is that it can reach a certain thickness and hardness, after drying, it is like a layer of iron sheet, and the whole bathroom is like an iron bath; Second, it can be well combined with cement, especially good for future brick laying, and the integrity can be 100%.

  5. Anonymous users2024-01-19

    After the renovation of water and electricity, it is recommended to use mortar waterproofing agent, which is not only firm with the base surface, but also has high puncture resistance, can have the same life as the building, and the construction is simple and cost-effective, which is the preferred material for home decoration waterproofing.

    Note] Follow the application instructions of the product to ensure a good waterproof effect.

    There are two common ways to renovate water and electricity in the bathroom.

    The first way: first level the ground and then open the pipe groove, bury the water pipe in it, and then use mortar to level the pipe groove The second way: directly lay the water pipe on the ground and then use mortar to level the ground and cover the water pipe.

  6. Anonymous users2024-01-18

    Do not do engineering, provide free professional technical consultation for concrete waterproof leakage water repair, and avoid the trouble of repairing today, leaking tomorrow, repairing every year, and leaking every year.

  7. Anonymous users2024-01-17

    Apply with a waterproofing membrane or waterproofing. Be sure to pay attention to the waterproof end of the floor drain. The construction master should know how to do it, right?

  8. Anonymous users2024-01-16

    Anti-floor drain decoration company can do.

  9. Anonymous users2024-01-15

    When you buy waterproofing materials, the place where it is sold will tell you how to use it.

Related questions
5 answers2024-04-27

Is it JS or K11 waterproof paint?

Generally, the surface layer is treated after the transformation is completed, such as making a relatively flat protective layer or surface layer (you can use cement covering), and then doing the waterproof layer, prohibiting the person after doing the waterproof layer, and then doing a protective layer, (mainly to protect the destruction of the waterproof layer during the construction process of workers), the flatness requirements are not high, and then you can carry out the specific wall and ground paving construction. >>>More

1 answers2024-04-27

There is no such statement. The minimum pressure test is 6 kg, and the pressure drop in one hour shall not be greater than kg, that is to say, the pressure should be more than one kilogram after one hour, as for the master said that the valve leaks water is their business, how to close the valve without leakage has nothing to do with you, who knows whether it is a valve leak or a pipe leak? You only need an hour to press qualified, if you can't qualify, then there is a problem, (valve leakage is also a problem, indicating that the valve quality is not good, but it is not the main problem) you can refuse to pay, if you have any questions, you can ask me at any time.

2 answers2024-04-27

The salary ranges from a friend helping without money to asking a master to do a maximum of 200 yuan.

6 answers2024-04-27

1. It can be done under the washbasin and other places that are not easy to see, 2. Find a way to move the location of the floor drain, 3. Calculate the size of the floor tile and place it in the middle of a floor tile as much as possible.

4 answers2024-04-27

You should make a layer, but the base surface is not too thick, Oriental rainbow or Sika will do.