The toilet of a 6 storey factory building should be tested several times for closed water testing

Updated on Bathroom 2024-04-27
1 answers
  1. Anonymous users2024-01-23

    2 times, do it once before doing waterproofing, to check whether there is leakage in the building, because there is a waterproof layer when building, and it should be done once after waterproofing to test the effect of the waterproof layer.

Related questions
2 answers2024-04-27

The garage is laid out outside, the bathroom is in the innermost, the kitchen and entertainment room are on the sides, and the living room is in the middle.

2 answers2024-04-27

Which side of the leakage is repaired, this is generally the leakage of the gap around the floor drain, it should be done at that time when it was not blocked, to knock off the floor drain around and re-seal and fix it with waterproof materials, and brush the waterproof paint again as a whole is only on the surface, useless.

2 answers2024-04-27

The entrance is made inside the gate. At the same time, a pair of copper unicorns are placed.

1 answers2024-04-27

If you just finish it, try not to close the water for so long, after all, it is not completely dry, and it may bulge or damage the waterproof layer after a long time, and if it is completely dry, you can close the water for so long.

1 answers2024-04-27

New era and new ideas, don't believe in feudal superstition. The house is designed like this, and you can't change it. Besides, you have a house like this. Feudal superstition kills people. Don't think about it so much, live well. >>>More