In the kitchen, the floor tiles, the wall tiles, and the workbench are done first

Updated on Kitchen 2024-04-22
1 answers
  1. Anonymous users2024-01-23

    Wire. Water pipe. Gas: These have to be done first, and then the workbench, in the wall tiles, behind the floor tiles, how to do the workbench when the floor tiles are in the work!

Related questions
1 answers2024-04-22

Dear, Amway Meiling freezer, more than 30 years, focusing on refrigeration. Commercial freezers are super cost-effective.

2 answers2024-04-22

【Product Features】

Equipped with imported energy-saving and high-efficiency units, integrated design, truly low noise, to ensure that the product is durable, efficient, environmentally friendly and stable; >>>More

2 answers2024-04-22

Kitchen freezer Haishun brand is not bad, all stainless steel imported compressor units, than the general product life up to times, their products are trustworthy, because I myself bought there for more than two years and has not had a problem, so it is recommended to have a good production.

1 answers2024-04-22

Take out all the things inside, check if there is anything unclean and dirty, then blow it with an electric fan, and then put the things you need in when the inside is dry, and throw away anything that is useless.

1 answers2024-04-22

When purchasing a supermarket fresh-keeping cabinet, the first thing to investigate is the performance of the fresh-keeping cabinet. The main indicators of the fresh-keeping cabinet are listed as follows: >>>More