The floor drain of the shower room is installed, and the 50pvc pipe exposed to the ground should be

Updated on Shower room 2024-04-17
4 answers
  1. Anonymous users2024-01-23

    Don't cut to the end, just leave 5 mm.

  2. Anonymous users2024-01-22

    Cut it off, and then you have to dig down, and the floor drain is at least as flat as the ground or shorter.

  3. Anonymous users2024-01-21

    You don't need to level and tile.

  4. Anonymous users2024-01-20

    When installing the floor drain, cut it according to the actual situation, and do not cut it at present.

Related questions
3 answers2024-04-17

Dig the best permeable waterproofing can be done by yourself. >>>More

1 answers2024-04-17

1. Do a good job of waterproofing first, 2 then wipe a cement protection, 3 and finally lay non-slip floor tiles. >>>More

2 answers2024-04-17

There is a washing machine floor drain in the middle of the stainless steel that can be plugged in.

2 answers2024-04-17

The shower curtain will be moldy, and it will be more troublesome to clean than the bathhouse, but you can change the pattern after a while, which is quite fresh. >>>More