120 square meters, 2 living rooms, 1 kitchen, 6 rooms, 6 bathrooms, a total of one or three floors

Updated on Living room 2024-04-17
2 answers
  1. Anonymous users2024-01-23

    Okay, are there any construction conditions that have been fixed and cannot be changed: for example, the well, septic tank, balcony, staircase location ...... have been determined

  2. Anonymous users2024-01-22

    Generally speaking, it is done in about four or five days

Related questions
2 answers2024-04-17

Well, this house is worth a lot of money on Mars.

4 answers2024-04-17

Well, are there any construction conditions that have been fixed and cannot be changed: for example, the well, septic tank, balcony, staircase location ...... have been determined

2 answers2024-04-17

Generally, the details of each route are as follows:

1. The new buildings are now a distribution box outside the room, and the distribution box includes the electricity meter of each household and the total circuit breaker of each household. >>>More

1 answers2024-04-17

Connect the weak current box to the wireless router, and then wire each room from the router and connect a wireless router to the living room.

1 answers2024-04-17

When the materials arrive and other projects are reasonably coordinated, it will be about 25 days