How to install the shower room and what are the installation steps

Updated on Shower room 2024-03-31
7 answers
  1. Anonymous users2024-01-23

    The installation steps for the shower room are as follows:

    1. Prepare the necessary tools to use.

    2. Install the basin: combine the parts of the basin, adjust the level of the basin, and ensure that there is no water accumulation in the basin and at the bottom of the basin. The hose expands and expands with distance, connecting the basin floor to the floor drain securely.

    3. Test and protection: After installation, it is necessary to test the water in the inlet section to ensure that the water is unimpeded. Fourth, find the position, play the feast of the hole: use a pencil and a level to determine the drilling position of the aluminum against the wall, and use a percussion drill to punch the hole.

    4. Install aluminum: knock in the rubber particles at the drilling hole, and lock the aluminum strip to the wall with screws.

    5. Fix the glass: clamp the glass and lock it at the bottom basin borehole, and then fix it with screws.

    6. Install pipe jacking: find the corresponding position above the fixed glass and drill holes, install (straight mouth bevel) fixing seat and connect the pipe jacking. It is fixed to the top of the Xiangshi glass with a bent sleeve.

    7. Install the device shelf: Measure the position of the device shelf, tighten the shelf nut, fix the shelf glass, and keep it vertical and horizontal. Pay attention to waterproofing under the aluminum material that holds the glass in place.

    8. Install the movable door: install the hardware of the movable door and install the hinge at the reserved hole of the fixed door. After installation, adjust the position of the shaft core of the lotus leaf until the door feels the best.

    9. Do a good job of waterproofing: install suction strips or water-retaining adhesive strips on the side or under the glass as required. Use silicone to make tight joints between aluminum and the wall, glass and basin.

    10. Debugging and fastening: check whether each part is comfortable and smooth, and adjust it in time if problems are found. After adjustment, tighten the corresponding screws to make the whole shower room more firm.

    11. Finishing work: Insert the decorative aluminum strip into the aluminum material attached to the wall to ensure that its appearance is neat and generous. Finally, wipe the entire shower room clean with a rag.

  2. Anonymous users2024-01-22

    1. It is necessary to punch holes before installation, so measure according to the actual size of the product installation to see where the holes need to be punched and what height, which is usually required as long as it is convenient for family members. After the same amount of good size, it is necessary to carry out the process of threading, smearing lead oil, winding twine, etc., put on the elbow, smear the short section wire head with lead oil, wrap hemp, and finally install it on the nozzle.

    2. Then dock the shower and the copper inlet, but be sure to tighten the nut by hand when docking, and level the screw eye on the disc, mark out, and then remove the shower, hit a hole with a diameter of 40mm and a depth of 10mm, and cut the lead roll into the hole to top the solid, and must pay attention in the process of beating the dragon, not too shallow or too loose.

    3. The copper inlet should be padded with lead oil to prevent rust and oxidation, and the shower disc and wall should be fixed with wooden screws to prevent it from falling off when used in the future.

    4. When installing the shower on the water, the shower should be hung straight, the disc is close to the wall, mark out, and then the hole with a diameter of 40mm and a depth of 10mm should be made, and the lead roll should be cut into the top of the firm, and the nut should be padded and tightened by hand, and finally the disc should be fixed on the wall with wooden screws.

  3. Anonymous users2024-01-21

    Detailed explanation of the installation steps of the independent shower room:

    1. Preparation before installation of the shower room.

    1. Before the installation of the shower room, the materials and tools should be prepared first. The shower room installed this time is a simple shower room and does not have a chassis, so relatively few materials and tools are required.

    2. Material preparation: The materials used in the installation of the shower room include frames, tempered glass, handles, pulleys and other accessories.

    3. Tool preparation: A lot of tools are still needed in the installation process of the shower room, and it is best to prepare all these tools before installation. The tools used in this installation include a tape measure, a pencil, a percussion drill, a hand hammer, an electric screwdriver, a glue gun, a manual screwdriver, a wire cutter, etc.

    Second, install the basin:

    First of all, the materials of the shower room after unpacking are safeguarded separately to prevent falling damage, and it is also important not to touch other things, especially glass, which is easy to break, and it is best to carry out more than two people at the same time when handling, so be careful. Then it's time to prepare to install the basin, assemble the various parts of the basin, adjust the horizontal position of the basin, and wipe the inside with a cloth to make sure there is no water inside. The hose expands and expands with distance, connecting the basin floor to the floor drain securely.

    After installation, a water test should be carried out to ensure that the drainage below is unimpeded.

    3. Install glass and shelves:

    Use a pencil case ruler to find a place on the wall and punch a hole with a percussion drill, then knock plastic particles into the hole, and lock the aluminum strip to the wall with a screw. Lock the glass clamp at the hole in the bottom basin and fix it with screws. Find the corresponding position above the fixed glass to drill holes, install (straight and beveled) fixing seats and connect the pipe jacking.

    Fix it to the top of the glass with a bent sleeve, and finally set the device frame in the right position, tighten the shelf nut, fix the shelf glass, and keep it vertical and horizontal.

    Fourth, the installation of movable doors:

    Install the hardware of the movable door and install the hinge at the reserved hole of the fixed door. After installation, adjust the position of the shaft core of the lotus leaf until the door feels the best. Then install the suction strip or water retaining strip on the side or under the glass as required.

    Use silicone to make tight joints between aluminum and the wall, glass and basin.

    5. Inspection and debugging:

    Check whether each part is comfortable and smooth to use, and adjust it in time if any problems are found. After adjustment, tighten the corresponding screws to make the whole shower room more firm. Insert the decorative aluminum strip into the wall aluminum to ensure that its appearance is neat and elegant. Finally, wipe the entire shower room dry with a rag.

  4. Anonymous users2024-01-20

    The first step should be for the installation of the basin. For the installation of the bottom basin, it is true that the waterlessness of the bottom basin is very important. If there is moisture retained, it will have a great impact on the installation.

    At the same time, when the bottom basin is connected with the pipe, it is necessary to pay attention to the firmness to prevent water leakage. For hoses, you can adjust the distance as needed. For details, you can refer to it.

    It is necessary to check with water to ensure the accuracy of the installation and to ensure that the water can flow away properly. This is followed by the perforation of the aluminium against the wall.

    Then the fixing particles and other components are injected into it, and then the aluminum strip is fixed to the wall, and then the glass material to be used is fixed to the place where the bottom basin is drilled.

    Drill a hole in the fixed glass, then install the holder and connect the jacking pipe. Then it's time for the installation of the shelves. We know that if there is no shelf in the shower room, it will be difficult to put the clothes that you change when you go in the shower.

    Installing a movable door can save space and make it easier to push and pull. The next step is to do a good job of waterproofing and fixing between the glasses. Use glass glue to seal the place that needs to be sealed and fixed.

    Then check the installed shower room to ensure that the installed shower room is normal waterproof, drains smoothly, and can be used normally. If you find that there is a certain deficiency in water inlet and drainage, you should pay attention to the renovation and tighten the screws and the like. Then remember to wipe the shower room clean with a rag.

  5. Anonymous users2024-01-19

    1. Prepare the necessary tools to use. Mulch.

    2. Install the basin: combine the parts of the basin, adjust the level of the basin, and ensure that there is no water accumulation in the basin and at the bottom of the basin. The hose expands and expands with distance, connecting the basin floor to the floor drain securely. Mulch.

    3. Test and protection: After installation, it is necessary to test the water to ensure that the water is unimpeded. Fourth, find the position and punch holes: use pencils and levels to determine the drilling position of the aluminum against the wall, and use a percussion drill to punch holes. Mulch.

  6. Anonymous users2024-01-18

    Before installing the shower room, the actual size of the installation space should be measured to confirm the location of the water and electricity pipes. When installing the product, first place the shower tray or marble strip, the bottom basin should be as close to the wall as possible during installation, adjust the level of the upper surface, put the water pipe into the drainage pipe on the ground, and pay attention not to bend; The installation of marble strips should be placed according to the installation size of the shower room. Then install the lower track of the rail-type shower room against the wall, pay attention to the vertical column and the wall, and the lower track should be lightly placed on the shower bottom tray.

    Tools Raw materials.

    1.If the cornerstone of the shower room is not level, the grinding machine should be used to grind off the higher part, and it is best not to use tiles or other things to cushion up, because the gap between the pads is too large, which not only hinders the appearance, but also the glass glue is aging and loose for a long time, and it is easy to leak.

    2.Polishing the cornerstone, finding the level.

    3.Assemble the frame of the shower room.

    4.Put the frame of the shower room on the cornerstone of finding a good level, measure the verticality of the fixed frame, mark the position to be punched with a marker, and pay attention to whether there is water and electricity at the position of the hole to be punched. Avoid unnecessary losses and troubles caused by electric drills hitting water pipes and wires.

    Assemble the fixed glass on both sides of the shower room and embed the sound-dampening soft strips.

    5.Install the movable door, install the pulley on the movable door, hang the upper pulley into the sliding track, press the lower pulley spring fixed twist with your hand, make the pulley pop into the lower track, and then press the handle of the movable door.

    6.Lined with glass glue on all sides. Wait for 48 hours, and then you can take a shower after the glass glue is air-dried!

    Precautions. When installing the fixed glass, the track shower room should also be installed on the track, and attention should be paid to the installation of unilateral rubber strips and water retaining rubber strips. Finally, install the movable door and other accessories such as handle, limiting rubber particles, the track shower room should be loaded into the pulley first, and the fixed glass of the shower room fixed by the bracket is connected with hinges between the movable glass, and the fixed bracket is installed to fix the fixed door.

  7. Anonymous users2024-01-17

    To have a wonderful shower experience, shower room installation is key. So how to install the shower room and what are the installation steps? Are you clear on this question? If you don't know, follow me to find out.

    In winter, the shower room can also play a role in heat preservation, water vapor gathers in a small space, the heat will not be lost quickly, and the whole space is warm and comfortable. The comfort of the shower room is closely related to the installation, so the installation of the shower room is also very particular.

    1. Preparation: Prepare the tools and materials required for the installation of the shower imitation room.

    2. Install the basin: combine the basin parts, adjust the level of the basin, and ensure that there is no water accumulation in the basin and at the bottom of the basin. The hose expands and expands with distance, connecting the basin floor to the floor drain securely.

    3. Test and protection: After installation, it is necessary to test the water to ensure that the water is unimpeded, determine the drilling position of the aluminum against the wall, and use a percussion drill to punch the hole.

    4. Install aluminum: knock in the rubber particles at the drilling hole, and lock the aluminum strip to the wall with screws.

    5. Fix the glass: clamp the glass and lock it at the bottom basin borehole, and then fix it with screws.

    6. Install pipe jacking: find the corresponding position above the fixed glass and drill holes, install the holder and connect the pipe jacking, and fix it on the top of the glass with a bent sleeve. 7. Install the device shelf:

    Align the position to install the object frame, tighten the laminate nut, fix the laminate glass, keep it vertical and horizontal, and do waterproofing under the aluminum material of the fixed glass.

    8. Install the movable door: install the hardware of the movable door and install the hinge at the reserved hole of the fixed door. Adjust the position of the shaft core of the lotus leaf, which is convenient to close the door when using and feels good.

    9. Do a good job of waterproofing: install suction strips or water-retaining adhesive strips on the side or under the glass as required. Use silicone to make tight joints between the aluminum and the wall, glass and the bottom basin.

    10. Debugging and fastening: check whether each part is comfortable and smooth, and adjust it in time if problems are found. After adjustment, tighten the corresponding screws to make the whole shower room more firm.

    11. Finishing work: Insert the decorative aluminum strip into the aluminum material attached to the wall to ensure that its appearance is neat and generous.

    It should be noted that the shower room needs to be installed in the later stage of decoration, but the water retaining strip of the shower room should be embedded with floor tiles when laying tiles, so as to achieve a good fiber water retention effect. After the installation of the shower room is completed, the entire shower room needs to be wiped clean with a rag, and it is best to let the shower room sit for 24 hours before use. The shower room also needs to be cleaned and maintained from time to time during use, which can ensure that every bath is a warm enjoyment.

Related questions
5 answers2024-03-31

The first step should be for the installation of the basin. For the installation of the bottom basin, it is true that the waterlessness of the bottom basin is an important point. If there is moisture retained, it will have a great impact on the installation. >>>More

1 answers2024-03-31

1.Preparation and basin installation: Regular shower room manufacturers will send professionals to install it, and use all the tools with you, which is faster and more convenient. >>>More

3 answers2024-03-31

The bathroom is actually very good, and it looks more classy, and now most people will install it at home. It is generally recommended to install a shower room, which can effectively separate dry and wet, not only reduce the workload of cleaning after bathing, but also reduce the humidity of the bathroom and reduce the breeding of bacteria. Most bathrooms don't have windows, and only air circulates through doors and exhaust fans, which, combined with no sunlight and humidity, can easily harbor bacteria. >>>More

10 answers2024-03-31

In the decoration of modern home houses, most people put their eyes on the shower room. >>>More

11 answers2024-03-31

Nowadays, many people choose to install a shower room at home, separating the sink from the bathing place in the bathroom. So how do you install a shower room? Next, PChouse will introduce to you how to install the shower room. >>>More