Pay attention to the sunken bathroom, whether it is waterproof or water and electricity first?

Updated on Bathroom 2024-03-24
4 answers
  1. Anonymous users2024-01-23

    First, the characteristics of the sunken toilet.

    Second, the construction steps of the sunken toilet.

    1. Make a layer of waterproof first. As we all know, the waterproofing of the bathroom is very important, involving several locations such as basins, shower rooms, toilets and bathtubs, which are frequent places for water leakage. Sunken toilets are different from ordinary toilets, and the first layer of waterproofing has been done at the time of delivery.

    Sunken toilets are not waterproof. Therefore, before construction, the first waterproofing must be done.

    2. After doing the waterproofing, start to do the steps of pipe laying, water and electricity. Among them, it is necessary to fully check the nodes in the process of pipeline laying, generally speaking, water leakage exists at the interface where the pipeline is connected, and the pipeline itself is very firm and will not leak.

    3. Precautions for sunken toilets.

    It is necessary to do the water on the ground and the electricity on the ceiling to prevent electricity leakage when the water leaks. In addition, when brushing waterproofing, it should be noted that the entire house should be brushed waterproof, not on the ground. Because tiles have a certain permeability.

    Especially the location of the shower room, if the back is a wardrobe, then it is easy to get moldy.

    The process requirements of the sunken toilet are higher than those of ordinary toilets, and they must be strictly implemented to ensure that nothing goes wrong.

  2. Anonymous users2024-01-22

    It should be waterproofed first, 24-hour closed water test, and then hydropower, after the water and electricity are finished, the bricklayer backfills, and then the top is waterproofed again.

  3. Anonymous users2024-01-21

    I didn't look closely at how other people's things were done at home, but I did waterproofing in advance at home, and then I did the water and electricity. The advantage of this is that the PVP pipe can protect the line waterway from external interference and corrosion even in the case of water, which is generally done by household hydropower.

  4. Anonymous users2024-01-20

    For the bathroom, it must be waterproof first, if the bathroom is not waterproof first, the water will leak directly into the next layer, which will cause the next layer to be full of water.

Related questions
1 answers2024-03-24

It is very convenient in terms of drainage arrangement, and it will not be like the traditional bathroom, which needs to pass through the floor and take over to the downstairs bathroom, which is inconvenient and also affects the private space of the downstairs neighbors. >>>More

2 answers2024-03-24

Do a good job of waterproofing first, and then when you hit the expansion bolt, just add structural adhesive to the hole!

2 answers2024-03-24

Sunken toilets need to be waterproofed once before backfilling, and it is recommended that it is best to use mortar waterproofing agent to do it, because it is stronger and more resistant to punctures, and it is not easy to be punctured when backfilling. >>>More

6 answers2024-03-24

First do a good job of the slope of the sinking position, and then do waterproofing, after doing a good job of waterproofing, place the sewage and drainage pipes, and then cover the cast-in-place putty board, and then do waterproofing. This is the practice of sinking caissons, doing secondary drainage.

1 answers2024-03-24

The first step is to do a waterproofing treatment on the caisson. >>>More