Please ask which is the first to carry out the construction of the ceiling or the floor tiling, than

Updated on Suspended ceilings 2024-03-02
3 answers
  1. Anonymous users2024-01-23

    Hello! According to the normal construction order, it is all up first and then down. Try to finish the things on the ground first, which can effectively reduce the probability of damage to the floor tiles; If you first stick the floor tiles and then make the ceiling, the ground needs to be carefully protected, otherwise it is difficult to ensure that the floor tiles are not damaged, and doing such protection measures will increase the cost, which is not cost-effective.

  2. Anonymous users2024-01-22

    Floor tiling? How to paste? If the floor tiles are floored, the floor tiles should be laid first and then the ceiling should be made, and if the floor is floored, the ceiling should be paved first.

  3. Anonymous users2024-01-21

    It was the masons who did it first, and then the carpenters.

Related questions
8 answers2024-03-02

Solid wood flooring is the ground formed by the drying and processing of wood. >>>More

3 answers2024-03-02

PT01 is the number of the material, the same is the same kind of ceiling material used, CH3200 refers to the distance between the bottom surface of the finished ceiling and the ground plane after completion.

1 answers2024-03-02

Answer: Crosshairs first, then rectangles. XY direction, every 50mm space. >>>More

7 answers2024-03-02

The installation of decorative gypsum board ceiling can be set up according to the material conditions of various places, such as shelving and flattening, screw fixing and adhesive bonding. (1) Shelving flat method: when using T-shaped aluminum alloy keel or light steel keel, the decorative gypsum board can be shelved in each grid frame composed of T-shaped keel, that is, to complete the ceiling construction. >>>More

2 answers2024-03-02

Wood and crocus longan are used as high-quality raw material resources for wood flooring. >>>More