The bathroom should be wrapped with the sewer pipe or the ground leveled first

Updated on Bathroom 2024-03-22
2 answers
  1. Anonymous users2024-01-23

    If you want to wrap the pillars with tiles, you need to wrap the pipes first.

  2. Anonymous users2024-01-22

    If it is a woodworking board bag, you can first level and paste the bricks, but the bathroom moisture is heavier, and the woodworking board is not suitable for use in the bathroom!

    If it is wrapped with red bricks, it is okay to ensure the pipe before the bricking, but we are done with water and electricity, and the masons enter the site to start the guarantee (before leveling).

Related questions
1 answers2024-03-22

(1) Use bricks, and then use cement sand and plaster bricks; >>>More

26 answers2024-03-22

It is to put the water first and then level.

The specific process of home decoration bathroom floor: >>>More

1 answers2024-03-22

1.Carbon deposits can cause insufficient combustion of gasoline and cause the engine to shake. The impact of engine carbon deposition on the car is quite large, first of all, to reduce the engine power, that is, to make the power output uneven and gradually decay, in other words, more and more powerless. >>>More

3 answers2024-03-22

If you want to apply tiles, you can't use gusset plates, you should use cement pressure plates or light bricks.

1 answers2024-03-22

It can be removed and pasted from the new paste, without affecting the others, pay attention to the reserved inspection port, so that the pipe can be used to check it.