-
It doesn't matter, as long as the furniture doesn't block the heaters.
-
Hello, the new house should wait for the end of the heating pressure test, including the water and electricity all checked in the furniture, so as to prevent accidental water leakage caused by losses.
The pressure can be tested, and the pressure test is the pipeline. After the radiator is installed in the pipeline, there will be a pressure gauge to start the pressure test, until the final decoration is removed, the purpose is to detect whether there is damage to the pipeline during the installation, to see if the pipeline is damaged, if you do not agree, it is best to inject water into the system first, check whether there is any dripping.
Hello landlord!
The toilet facing the front door is really not very good, if you can still try to renovate it, the reasons are as follows: >>>More
Yes, there is no problem.
If you want to take refuge, you must first choose a good master, and it is very important to practice a good master, choose a good master, and then you have to make an appointment with the master to see which day you will take refuge. >>>More
Feng Shui refers to beams, which are the load-bearing beams that build buildings, so people can't sleep and sit underneath this. >>>More
If you get the key, it's already open, just pay the money directly.