It is recommended that you do not engage in any destruction, because it is really time-consuming, laborious and costly. It is recommended that you first leave the ground dry for 2 days.
Then use the prepared white cement to fill the leakage between the tiles, after the white cement is dry, directly brush a digging layer CPC leak prevention agent, this thing is very powerful, after the white cement is dry again, your problem will be completely solved, if you have any problems, you can add or ask me.
-
It is recommended that you do not engage in any destruction, because it is really time-consuming, laborious and costly. It is recommended that you keep the ground dry for 2 days and then fill the leakage between the tiles with prepared white cement, and directly brush a layer of CPC leakage prevention agent after the white cement is dry, this thing is very powerful, after the white cement is dried again, your problem will be completely solved, if you have any questions, you can add or ask me.
-
Re-do waterproofing The developer's waterproofing is all fooling.
-
Let's just do waterproofing, the black one is polyurethane, and it doesn't do much.
-
What's the matter, mix some cement powder and coat it, cover the bricks, fill the grout, and it's good.
The problem of the waterproof layer is certain, otherwise it will not leak downstairs. >>>More
If you buy a clear water house, then the developer has done waterproofing when handing over the house, it is recommended to do a 48-72 hour closed water test when receiving the house to check whether there is a problem with the waterproofing. >>>More
In the decoration process, the waterproof construction of the bathroom is a very critical step, because the water consumption of the bathroom is the most used place in the house, if the waterproofing is not done well, it will bring great inconvenience to the owner after moving in. Do the base leveling. Use polyurethanes, C, polymers, cement mortars, etc., similar to paints, when brushing waterproof for the first time. >>>More
1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More
1. Base surface treatment:
Leveling, cleaning (no debris and dirt on the base surface), moist base surface. Pipe roots, floor drains, drains, yin and yang corners and other parts that are prone to leakage should be treated first. >>>More