My house has just been renovated, but the roof of the alkali worker said that he couldn t do Dabai,

Updated on Suspended ceilings 2024-03-05
3 answers
  1. Anonymous users2024-01-23

    Put the previous ones to the place where there is no big white, and then scrape it again, it is impossible not to get it, I am also doing decoration design, such a problem has not appeared, you use the workers to shake you.

  2. Anonymous users2024-01-22

    Big White - Did I go back to the 80s. Alkali return is not able to do other treatment, you can brush the interface agent and then scrape the putty, and then spray paint to prevent the wall skin from falling off due to alkali. If there is no open pipe wiring on the top, don't hang it, it's too low and depressing.

    In addition, the ceiling should be proposed by you rather than by the worker, so the worker may want to make more money, and the heart is a little unright, so be careful. After doing it, the price may be double that of the beginning of the quotation, everything is left for snacks, and the water and electricity are written down how long the pipe is used (this is more ruthless, often hundreds of workers to thousands or even tens of thousands, because you don't know how long the pipe is after installation, you must understand that only by demolishing the wall, you can only suffer if you don't want to) There are many aspects, pay more attention, and now the decoration industry is getting darker and darker, and workers are also, such as the workers who stick the bricks deliberately stick a little crooked, and if you want to rework, they will ask you to add money, If you don't add money, not only will you not rework, but you will also put half of the work and don't do it, these are typical practices, and you suddenly say that you should do this, you should add that, but you really add money, you will be confused, and the addition will also make you confused. Therefore, the original design cannot be changed is the first principle.

  3. Anonymous users2024-01-21

    It's okay to do latex paint, it's best to do 2 bottoms and 2 sides.

Related questions
4 answers2024-03-05

Try to ensure the height of the original roof, and reduce the shape of the space According to the design of the whole day, choose the appropriate style and shape according to your preferences, add light strips, spotlights, gypsum lines, lattices, wood lines or something A little embellishment is the best

1 answers2024-03-05

Is the kitchen close to the house next door, there is a possibility that the upstairs next door is leaking. There is also a flue in the kitchen, to see if the flue is leaking, the flue texture is relatively loose, and the water in it is not necessarily directly upstairs, but may also be more leaking from the people above.

2 answers2024-03-05

If you don't have a water pipe up there, you're upstairs.

1 answers2024-03-05

First of all, the region is different, the price of materials is also different, take Harbin as an example, a 30-square-meter living room with only one circle of sheds, with the normal level of materials oilers with about 2000 materials. There are about 1000 woodworking materials and 1000 to 1500 workers. All down 6000 is enough.

2 answers2024-03-05

Now the common phenomenon, mainly the tile joint infiltration to make the shed leakage, generally the tile joint with white cement mixed with glue can be done, maintenance it, so that the tile joint no leakage can be.