Whether the bathroom floor is leveled should be buckled by the column

Updated on Bathroom 2024-03-24
1 answers
  1. Anonymous users2024-01-23

    Do you stick to the floor or touch it directly with sand and cement?

    If you use sand and cement directly, it is about 1:1.

    Just stick it 2:1.

Related questions
2 answers2024-03-24

Is the bathroom floor of the new house recruited by your business or looking for the owner? This situation is generally the responsibility of the renovation company.

1 answers2024-03-24

Generally, if the thickness of a large area exceeds 3CM, do not complete the construction at one time, otherwise there will be cracks, and the bean stone should be used to make a cushion, and it is advisable to use mortar for leveling.

26 answers2024-03-24

It is to put the water first and then level.

The specific process of home decoration bathroom floor: >>>More

3 answers2024-03-24

Depending on what kind of material, generally 24-48 hours after the water test, the construction can be carried out after the water test.

1 answers2024-03-24

Hello! There is generally no separate toilet in the hotel box or private room, the main reason is that the actual usable area of the box or private room itself is limited, and if a separate toilet is set up, the actual usable area will be preempted. >>>More