Fire alarm ceiling inside the pipe partition wall under the pipe clearance how much is a point

Updated on Suspended ceilings 2024-03-12
1 answers
  1. Anonymous users2024-01-23

    Fire alarm ceiling inner open pipe. Partition wall under the reverse pipe. Clearance: 65-75 a point.

Related questions
1 answers2024-03-12

Wiring of the fire sprinkler alarm system:

The wiring of the fire terminal box is classified and connected according to the functional requirements, and it is generally connected in parallel. >>>More

1 answers2024-03-12

Just find a firefighter and just replace it. They know how to do it.

1 answers2024-03-12

Since it's a fire fight, fire safety must have happened and it's used to sound the alarm.

1 answers2024-03-12

The JDG tube has already been coated with anti-corrosion, so there is no need to do it again!

2 answers2024-03-12

Determined according to the design requirements.