The sanitary partition wall is poured with 300 high C20 concrete first, how to understand whether th

Updated on Bathroom 2024-03-01
2 answers
  1. Anonymous users2024-01-23

    It's pretty much the same as the answer upstairs. If the top of the bathroom is the upper floor of the ground ring beam. Generally, the beam specification is 300X200 240 360 480 or 500X240 360 480 540.

  2. Anonymous users2024-01-22

    That's the pillow. The main purpose is to make it waterproof. It's just a little high, the general height of the pillow is 120cm, and the pillow belt is like a pillow, which can be raised between people and the wall.

    If the installed gypsum board partition wall has moisture-proof requirements, the width and thickness of the concrete sleeper belt, and then install the partition wall on it. If you want to install a glass partition wall directly on the ground, you can also make a wooden pillow belt on the ground first, and then insert the glass into it.

    Toilet - 300mm is caisson. The floor of the bathroom with caissons does not need to be too high, and the positioning flexibility of the squatting toilet is large. And the waterproof effect is better (can be made as two layers of waterproofing).

Related questions
1 answers2024-03-01

First of all, from the perspective of professional interior design, the rooms in the hotel are relatively small, and the bathroom space is even smaller, and the transparency of the glass can expand the sense of space and will not bring a sense of depression to the guests. >>>More

3 answers2024-03-01

The hotel bathroom partition wall has brick walls, glass, new building materials, etc.

5 answers2024-03-01

Fine decoration usually the waterproof of the dry area of the bathroom is 300 high, and the wet area and the public wall part of the bedroom or study are 1800 high. Waterproof to the root of the wall foot pipe root first, and then do a large surface, first difficult and then easy, waterproof paint twice to vertical brush, a waterproof completion, water storage 24 hours without leakage, and then do mortar protective layer, and then tiling.

4 answers2024-03-01

1. Skeleton partition wall.

Sanitary partition wall can use light steel keel steel mesh plastering partition wall, this material can meet the requirements of sound insulation, heat insulation, flame retardant, moisture-proof, etc., skeleton partition wall is also called keel partition wall, mainly with wood or steel to form the skeleton, and then on both sides to do the surface layer. The skeleton is composed of upper sill, lower sill, vertical bar, transverse bar, diagonal brace, etc. >>>More

3 answers2024-03-01

If it is a partition wall, it is necessary to make the wall first, and then the ceiling. If it is a movable partition (push-pull partition, glass partition, plastic steel partition, etc.), you can make a ceiling first, and then a partition.