Illustration of how to install a floor drain in the bathroom

Updated on Bathroom 2024-03-24
5 answers
  1. Anonymous users2024-01-23

    1. Match the floor drain in advance according to the diameter of the sewer pipe.

    Before buying a floor drain, you should know the diameter of the floor drain sewer pipe, which is generally 50 PVC pipes now, and the cast iron ones are larger. The selected floor drain water diameter should match the diameter of the PVC pipe, and the reserved holes for drainage are generally large when the house is delivered, and the decoration needs to be trimmed, and the drainage outlet should be done according to the size of the floor drain, do not trim the drainage outlet first, and then go to buy the floor drain. [Bathroom drainage pipe installation] [Bathroom floor drain purchase].

    2. The location of the floor drain installation.

    When installing the floor drain, it should be installed as low as possible, the position of the floor drain should be determined first, the floor tile is paved with slope to the floor drain, it is best to lay the whole brick at the floor drain position, the floor drain is installed in the middle of a brick, the diagonal line is opened, and it becomes like this, so that it is best to drain the water, look at the left of the above picture, if the floor drain is just in the middle of the two bricks, it is installed like this, see the right of the above figure. [Location of the floor drain in the bathroom].

    3. The connection between the floor drain and the sewer:

    Generally, the drain interface of the floor drain can be inserted into the sewer pipe, and the four-proof floor drain is inserted into the sewer pipe.

    Because this floor drain should be filled with water sealing core, so it can not be done too fine, if you add a circle inside, then the water sealing core must be made a little thinner, so it is made like this, only a small circle is stuck on the sewer pipe, and it does not affect the installation. If this kind of structure is a general residence, there is no problem, because after the ground is waterproof, when laying bricks, the floor drain core is aimed at the drain and smeared with cement, which is generally not a problem. But this kind of floor drain is not suitable for the frame floor, after installation, it will be unstable back and forth, there will be gaps, once the sewer under it is blocked, its water will flow into the floor, fortunately, there are not many such structural floor slabs.

    When installing the floor drain, special attention should be paid to the bonding and sealing of the connection between the floor drain and the sewer pipe, and the installation should be tight, and it can be sealed with professional adhesives or glass glue.

  2. Anonymous users2024-01-22

    1. Clear the original floor drain and clean up the surroundings.

    2. Soak the inner wall of the ground sewer pipe with clean water.

    3. Completely soak the floor drain seal with clean water.

    4. Align the center of the floor drain with the center of the sewer pipe, and put the floor drain into the sewer pipe and press it tightly 5 to ensure that the level of the floor drain is slightly lower than the ground.

    6. Put on the floor drain cover and clean the ground.

    7. Use sealant to seal the part of the floor drain in contact with the upper part of the sewer pipe 8.

  3. Anonymous users2024-01-21

    1. Before installation, the drain pipe should be bandaged and protected. When installing, first remove the bandaging protection, and then check whether there is grit and mud inside the pipe and whether it is blocked. If the nozzle is stained, you need to clean it with a dry cloth first.

    If the drain pipe is too close to the ground, the drain pipe should be cut short appropriately so that the floor drain installation panel is slightly lower than the ground.

    2. The installation of floor drain is generally carried out at the same time as the floor brick laying. After the ground is waterproofed, you can lay bricks and install floor drains. The general floor drain installation is relatively simple, before installation, select the corresponding size of the floor drain, smear the floor drain with cement, align the drain, and then cover the floor drain panel.

    3. When installing the floor drain in the kitchen and bathroom, special attention needs to be paid to the slope of the flowing water. The general treatment method is to place the floor drain on the installation pipe and then take measurements to determine the tile cut size. Then cut the tiles, then fix the floor drain, and pave the cut tiles around the floor drain to form a sewer slope.

    4. After the floor drain is installed and fixed, it is necessary to pay attention to the gaps on the four sides of the floor drain to be sealed with glass glue or other adhesives to ensure that the odor of the sewer pipe cannot be emitted through the gaps.

    5. When the floor drain is installed and accepted, the floor drain sealing core needs to be easily taken out and installed, pay attention to the cement mortar not to wrap the floor drain sealing core or hold the sealing gasket against it, which will cause the sealing core to be unable to be taken out or the sealing gasket to be unable to open. The floor tiles laid in the kitchen and bathroom need to be inclined to the floor drain along the horizontal plane, and the floor drain installation acceptance is also related to the acceptance of the floor tile laying. In addition to the good drainage performance of the floor drain itself, the entire kitchen and bathroom floor tile area is required to be flat, and the flowing water must flow smoothly to the floor drain and drain away, and no water can accumulate.

  4. Anonymous users2024-01-20

    The floor drain is placed at the mouth of the floor drain and fixed (cement).

  5. Anonymous users2024-01-19

    1.Before replacing the floor drain in the bathroom, you need to prepare the required materials and tools, such as cement mortar, screwdrivers, hammers, scrapers, and new floor drains.

    2. You should also confirm whether the new floor drain is consistent with the size of the old floor drain at home, the common square floor drain size is 10 cm, there is also a 12 cm round floor drain, and the diameter of the sewer pipe is generally 5 cm.

    3.Use a screwdriver to slowly lift and separate the old floor drain and the surrounding tiles, and then use a screwdriver to slowly get out the cement around the old floor drain, and then use a hammer to gently tap the floor drain to completely separate it from the cement, and then take out the floor drain. Finally, use the groove to clean up the residual cement around the installation position of the floor drain, so that there is no debris and is convenient for later installation.

    4.After the installation position of the floor drain is cleaned, the water-resistant putty can be treated on the wall around the floor drain, and the back of the new floor drain also needs to be smeared with putty, which is to make the floor drain and the ground more bonded. However, it is necessary to shovel away the excess cement mortar and clean up the garbage on the ground.

    5.When installing the floor drain, it is necessary to take out the core layer of the floor drain first, so as to avoid the cement mortar running into the construction and affecting the use of the floor drain. The installation height of the floor drain should be flat with floor tiles, not higher than the ground, and then apply white cement around it for sealing, install the core layer and table cover, and dry it naturally, you can use the floor drain.

Related questions
2 answers2024-03-24

The bathroom floor drain has a peculiar smell, teach you a way, completely solve the smell and small flying insects, the method is awesome, life tips, life tips, I hope you will like it, thank you.

2 answers2024-03-24

1. Before installation, the drain pipe should be bandaged and protected. When installing, first remove the bandaging protection, and then check whether there is grit and mud inside the pipe and whether it is blocked. If the nozzle is stained, you need to clean it with a dry cloth first. >>>More

9 answers2024-03-24

It's very troublesome to block the floor drain, come and learn this trick.

12 answers2024-03-24

The bathroom must be equipped with a floor drain; The general bathroom has four sewage outlets, one is the drain of the basin, the second is the drain of the shower room, the third is the floor drain (the exposed place is placed to drain the water in time) and the fourth is the sewage outlet of the toilet.

2 answers2024-03-24

The floor drain and bricks are flattened, and it is necessary to cut bricks in a trapezoidal shape around it.