-
To do waterproofing, the ground should be guaranteed to be dry before operation, so that the effect is better; So after the ground is knocked open, it still has to be dried; When installing the Moen shower room, the waterproof treatment should be done well.
-
It's good to dry some, not bad for that day or two,
-
One more cool day, not bad for this day, or it will be very troublesome in the future.
-
It is better to dry it for a few more days.
The height at which the towel rack is generally installed in the bathroom: >>>More
Must be shoveled clean!
You have to have the tools you need to be handy. >>>More
Add a shower floor and you're good to go.
If you don't do waterproofing, what should you do if it leaks below, and if people are looking for you to lose money, let's do waterproofing first. >>>More
The shower wall is not waterproof, there will be trouble in the process of use in the future, the water will penetrate downstairs, it is recommended to rework and deal with it, sooner or later it will have to be reworked, and then it will also damage the neighborhood relationship upstairs and downstairs, it is best to solve the problem before it comes out, it is recommended to do waterproof about 2 meters high.
The wall of the bathroom needs to be waterproofed, which is the standard of architectural decoration, which can not be ignored, and it will also affect your residence if you do not do waterproof for a long time, because there must be a room next door to your bathroom, and there is a simple decoration on the wall. If your hygiene has not been waterproofed for a long time, the water on the bathroom wall will easily corrode and affect your other rooms, so it is necessary to do waterproofing on the bathroom wall.