Problems with toilet waterproofing? Is toilet waterproofing done after installing a squatting toilet

Updated on Toilets 2024-03-03
3 answers
  1. Anonymous users2024-01-23

    Toilet waterproofing should be done before the installation of the squatting toilet, not after the installation of the squatting toilet.

    The drain of the toilet is inserted into the inside of the sewer pipe and has nothing to do with draining.

    Toilet waterproof operation practices:

    Ground treatment. Before waterproofing, be sure to level the ground, if the ground is uneven, it may affect the effect of waterproofing, and may also cause cracking and leakage caused by uneven thickness of waterproof coating. Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur.

    wall treatment. If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub.

    After the waterproof layer is done, a certain amount of time should be left to make the waterproof layer better integrated with the building, and then the protective layer on the waterproof layer and then paved with floor tiles.

    Waterproof construction is a concealed project, the follow-up construction may also damage the waterproof layer, if the floor tiles have been laid, do not smash the floor tiles, with professional joint waterproof materials, all the gaps are blocked to do a good job of waterproofing. It is also suitable for waterproofing projects after the failure of the waterproof layer in the bathroom.

  2. Anonymous users2024-01-22

    No, before paving the floor and turning the ground, it is necessary to do a good job and do a water seal test before laying bricks, and then install the toilet, the discharge port of the toilet is inserted into the inside of the sewer pipe, and has nothing to do with the water discharge.

  3. Anonymous users2024-01-21

    To thoroughly waterproof, remember to cut off the water.

Related questions
1 answers2024-03-03

Waterproofing of the toilet is an indispensable step, because the bathroom is a necessary space for every family, and a clean and dry bathroom environment can bring pleasure to people. So how do you do toilet waterproofing? One: >>>More

10 answers2024-03-03

Before waterproofing, be sure to level the ground, if the ground is uneven, it may affect the effect of waterproofing, and may also cause cracking and leakage caused by uneven thickness of waterproof coating. Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur. >>>More

2 answers2024-03-03

All should be waterproofed That is, the ground, as well as the 1800-high wall above the ground must be waterproof, and it is recommended that the walls of the wardrobe be all done! >>>More

11 answers2024-03-03

I have a friend who is engaged in decoration, and I will help you get in touch.

4 answers2024-03-03

Find the property first, and if the property can't be found, the court will sue you. In this case, the upstairs must be repaired for you.