Is the half package kitchen ceiling and mobile phone washing ceiling paid by the owner?

Updated on Kitchen 2024-03-27
1 answers
  1. Anonymous users2024-01-23

    Half a package generally only includes auxiliary materials and artificial, such as cement, yellow sand, red bricks, water pipes, wires, network cables, etc., while the board and ceiling materials of the cabinet belong to the main materials and need to be purchased by themselves!

    The main materials include: floor tiles, floors, wall tiles, baseboards, hardware accessories, bathrooms (toilets, basins, partitions, shower showers, bathtubs, floor drains, triangular valves, mirrors, floor tiles, wall tiles) kitchen (wall cabinets, floor cabinets, floor drains, triangular valves, stoves, range hoods, floor tiles, wall tiles) wardrobes, sliding doors, bedrooms, kitchens, bathroom doors, etc.

    Auxiliary materials include: cement, yellow sand, red bricks, water pipes, wires, network cables, switch panels, gypsum boards, woodworking boards, plug-in boards, nine-centimeter boards, plywood and other boards, latex paint, caulk, tape, small hardware (nails, screws, etc.) and so on.

Related questions
1 answers2024-03-27

Measure the top surface area and add loss. If it is rectangular, the loss will be smaller, and if it is polygonal, the loss will be relatively large.

1 answers2024-03-27

Generally speaking, the kitchen is a fume, and damp place, if you choose to use gypsum board, it will be very troublesome to clean the ceiling in the future, because in a humid and heavy oil environment, wood or gypsum will be easily eroded, and its service life will be greatly shortened, especially if the interior is eroded, it is very troublesome to clean, and there is no way to clean it. Although some people choose to use PVC board in kitchen ceilings, because of the plastic, this kind of ceiling is easy to fade and age, and its service life will not be too long. However, if you use aluminum gussets, these problems will not appear due to the properties of aluminum gussets. >>>More

3 answers2024-03-27

The cabinet is measured first, and the cabinet is installed after the integrated ceiling is done. Personally, I think it's better to leave no gap between the wall cabinet and the ceiling.

9 answers2024-03-27

The integrated ceiling is a combination of HUV metal square panels and electrical appliances. Sub-gusset module, heating module, lighting module, ventilation module. Simple installation, flexible layout, convenient maintenance, has become the mainstream of bathroom and kitchen ceilings. >>>More

4 answers2024-03-27

It may be that there are gaps in the pipe joints inside, or it may be that the waterproofing upstairs is not good and leaking, if you use an integrated ceiling, you can use a suction cup to take down the board to see, what is the cause of it, at a glance [em01].