It can be done, if it is better, you can use Prates waterproof paint imported from Japan, and after the paint is done, it can be directly used for painting and other construction. But the price is more expensive.
The common practice is to use 911 waterproof paint, two degrees, and then fix the steel wire mesh outside, and then do the outside stucco and other construction, the price is more affordable.
-
No, waterproofing is an independent paint that can be used directly on the wall, and there are instructions on the barrel in general.
-
You can do it yourself, but the standard for doing it yourself is not too high, what if you miss it!!
-
Just do as you say, no problem.
Sometimes it's better to do it yourself than to ask someone else to do it.
1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More
Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority. >>>More
1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More
Toilet leakage is mainly concentrated in the pipe floor drain and around the corner of the wall, and these parts should be focused on when waterproofing. After the waterproof layer is done, the closed water test is carried out for 3 days, and the corresponding parts are carefully observed downstairs, and the decoration is carried out after there is no water leakage.
Under normal circumstances, the waterproof height of the bathroom wall should reach 30cm, if it is in the shower area, the waterproof layer of the wall where the shower is installed should be 180cm. Bathroom waterproofing must be done well. >>>More