1 91 1 bathroom decoration, need to install toilets, sinks, showers, how to be

Updated on Bathroom 2024-03-04
4 answers
  1. Anonymous users2024-01-23

    The upper right side is used to wash the surface with meters, occupy the upper wall meters, occupy the right wall meters, take the right wall from bottom to top to take the meters for the toilet to sit to the center line, the toilet sits right to the left, and the toilet edge has a meter space from the bottom wall to the bottom wall; That is, there is space for toilet use. There is a lower part of the washbasin space, and the upper part has a larger space, which can meet the use. The shower is set on the wall and is located at a distance of one meter from the left, that is, the bathing space. FYI.

  2. Anonymous users2024-01-22

    You should draw the location of the sewer pipe and the upper sewer pipe, otherwise it will be in vain to give you an idea. Because the sewer pipe cannot be changed, it means that the position of the toilet is fixed. The location of the sink and shower room can be changed.

    There is also a suggestion to look at your room type, although it is not clear the location of the pipe, but the door is seen, in order to increase the utilization rate of the bathroom, the door should be changed to a sliding door, so after entering the door, there is more area available.

  3. Anonymous users2024-01-21

    1. Can you consider opening the door outside, 2. You can also consider sliding the door down, and 3. Can you lead the basin to the outside.

  4. Anonymous users2024-01-20

    Consider taking a shower on the toilet!

Related questions
3 answers2024-03-04

Bathrooms are all required to install exhaust fans.

3 answers2024-03-04

This will be installed for you by the plumber master when you decorate it at home, and you just need to check the quality after the installation.

3 answers2024-03-04

Make the floor first, then put the toilet bowl and seal it with silicone. >>>More

3 answers2024-03-04

1. Bathroom decoration, the longest time is to do waterproof and water test experiments, the general normal situation is a week, if you encounter waterproof test failure, you need to reverse work, it will take a few more days. >>>More

11 answers2024-03-04

Wall: mirror, mirror lamp, switch box, shower shower, towel rack Ceiling: bath bomb, lamp floor: >>>More