After the bathroom of the building is done with waterproof sticky bricks, part of it is removed due

Updated on Bathroom 2024-03-28
1 answers
  1. Anonymous users2024-01-23

    Dig the best permeable waterproofing can be done by yourself.

    To do waterproofing, you need to do it on the front of the water.

    If the cement surface is to be waterproofed, use the super permeable waterproof guard of digging excellent black gold steel to do waterproofing (if there are cracks, gaps and potholes on the cement surface, fill the complete with digging beautiful butadiene glue and then do waterproofing).

    For the tile surface, first check whether the filling of the tile gap is complete (if the filling of the tile gap is incomplete, fill it with dug beautiful butadelon glue, and then use the black gold steel stone tile type to do waterproofing).

Related questions
1 answers2024-03-28

Only the corner of the attached wall goes to a pipe leading to the floor drain. It's not very aesthetically pleasing, so it's better to change the position again.

1 answers2024-03-28

Pull the line vertically along the flat wall, and then stick it along the line, and cut and dig when you reach the wrong place.

7 answers2024-03-28

The bathroom can be waterproofed without tiles, but there must be cement mortar on the waterproof layer, and there must be a certain thickness, otherwise the waterproof layer will be damaged! Let me share with you the construction of bathroom waterproofing: >>>More

3 answers2024-03-28

It's relatively easy to do it yourself.

First: ground leveling is the uneven place needs to be leveled, so as to save the amount of waterproof mortar and ensure waterproofing. >>>More

2 answers2024-03-28

After the bathroom is waterproofed, you can do the closed water test after the waterproof layer is completely dry, the closed water test time is generally 48-72 hours, and the closed water test is completed after the ground is dry, and you can use it normally after two days after the brick.